NSW 4.2.8 Damp-proofing membrane
Part 4.2 Footings, slabs and associated elements · varies 4.2.8 Vapour barriers
Delete clause 4.2.8 and insert NSW 4.2.8 as follows:
(1) A damp-proofing membrane must be installed under slab-on-ground construction for a Class 1 building and for a Class 10 building where the slab is continuous with the slab of a Class 1 building in accordance with (2), (3), (4) and (5).
(2) Materials: A damp-proofing membrane must be—
0.2 mm nominal thickness polyethylene film; and
high impact resistant,
determined in accordance with criteria specified in clause 5.3.3.3 of AS 2870.
(3) A damp-proofing membrane must be branded continuously “AS 2870 Concrete underlay, 0.2 mm High impact resistance”.
(4) Installation: A damp-proofing membrane must be installed as follows—
Lap not less than 200 mm at all joints.
Tape or seal with a close-fitting sleeve around all service penetrations.
Fully seal where punctured (unless for service penetrations) with additional polyethylene film and tape.
(5) The damp-proofing membrane must be placed beneath the slab so that the bottom surface of the slab is entirely underlaid and must extend under internal and edge beams to finish at ground level in accordance with Figure 4.2.8.
Notes
A range of polyethylene films can be used, including black film and orange film, provided they satisfy the requirements for high impact resistance in accordance with the criteria specified in clause 5.3.3.3 of AS 2870.