Free tools · NCC 2025 Volume One

Free NCC calculators for architects and building designers

Occupant numbers, exits, exit widths, travel distances, toilets, and Section J glazing with shading, worked out from the NCC tables in seconds. Free, no sign-up, and nothing you type leaves your browser.

D2D18 · D2D3 · D2D8 · D2D5

Occupant numbers, exits and exit widths

Add each use on the storey and its floor area. You get the number of persons from Table D2D18, how many exits the storey needs, the total exit width, and the travel distance limits that apply.

Uses on this storey

Building
0persons (D2D18)
1exits needed (D2D3)
1.0 mtotal exit width (D2D8)
UseAream²/personPersons

Travel distance limits (D2D5)

    Work out toilets for these persons →

    In CodeLens Studio
    • Rooms, areas and uses read from your floor plan, not typed in
    • Real travel paths measured on the drawing against these limits
    • Every exit door's clear width, swing and hardware checked (D2D9, D3D25)
    • Distance between alternative exits checked (D2D6)
    • Issues pinned on the sheet, in a report under your logo
    • NCC 2022 and 2019 projects and state variations
    Check my drawing free10 sheet reads free · no credit card
    F4D4 · F4D3 · F4D5

    Toilets for employees

    Closet pans, urinals and washbasins from Tables F4D4a and F4D4b. Enter the number of employees, or the males and females if you know the split.

    If you don't know the number of employees, use the persons from the calculator above as a starting point.

    MaleFemale
    People00
    Closet pans00
    Urinals0—
    Washbasins00
      In CodeLens Studio
      • Pans, urinals and basins counted on your plan and compared with the storey's population
      • Ambulant and accessible toilets found and checked at every bank (F4D5)
      • Accessible toilet sizes and signage flagged for checking (AS 1428.1, D4D7)
      • Shortfalls pinned on the sheet with the fix
      Check my drawing free10 sheet reads free · no credit card
      Section J · J4D6 · Specification 37

      Section J glazing, solar admittance and shading

      Check one facade's wall-glazing U-value and solar admittance against the J4D6 limits, and see how much an eave, fins or a screen help. The shading multiplier comes straight from Tables S37C7a–e.

      Wall and glazing
      Shading (S37C7)
      —U-value
      —Solar admittance
      1.00Shading multiplier
      Glazing0%
      Wall R needed—
        Specification 37 Method 1 (single facade). Ratios between table rows are rounded to the less favourable row, not interpolated.
        In CodeLens Studio
        • All four facades together, with Method 2 when one facade fails on its own
        • Glazing areas, U-values and SHGC filled from your window schedule
        • Roof, roof lights and floor R-values (J4D4, J4D5, J4D7)
        • Saved with the project and printed as a PDF for the energy consultant
        D3D14 · Housing Provisions 11.2.2

        Stair risers, goings and landings

        Enter the floor-to-floor height. You get every riser count that works, the going range for each, the number of flights and landings, and a comfortable going.

        RisersRiserGoing rangeSuggestedFlightsRun
          In CodeLens Studio
          • Stairs found on your sections and plans, with risers, goings and flights checked
          • Barriers, handrails and landings checked alongside
          • Issues pinned on the sheet
          Check my drawing free10 sheet reads free · no credit card
          D3D11 · D4D4 · AS 1428.1 · Housing Provisions 11.2.3

          Ramp gradient

          Enter the rise, and the run if you have one. You get the gradient, whether it works as an exit ramp, accessible ramp, walkway, step ramp or kerb ramp, and the run each needs.

          —gradient
          UseSteepestRun neededYours
          • Accessible ramps also need landings, handrails, kerbs and tactile indicators under AS 1428.1; step and kerb ramps rise no more than 190 mm.
          • Ramp floor surfaces need the slip resistance in Table D3D15.
          In CodeLens Studio
          • Ramps on your plan measured and checked against the right limit
          • Accessways and continuous accessible paths of travel checked (D4D2–D4D4)
          • Issues pinned on the sheet
          Check my drawing free10 sheet reads free · no credit card
          D4D6

          Accessible car parking

          How many accessible spaces a car park needs for the class of building it serves.

          —accessible spaces

          • Spaces must comply with AS/NZS 2890.6; signage isn't required where there are 5 or fewer spaces in total (D4D6(1)).
          In CodeLens Studio
          • Car spaces counted on your plan and the accessible ones checked
          • Accessible paths from parking to the entrance checked
          • Issues pinned on the sheet
          Check my drawing free10 sheet reads free · no credit card
          C2D2 · C3D3

          Type of construction and fire compartment size

          Type A, B or C construction from the class and rise in storeys, and the largest fire compartment allowed.

          —type of construction (C2D2)
          —max compartment (C3D3)
            In CodeLens Studio
            • Construction type and compartment areas checked from your plans
            • Fire separation between classifications flagged (C3D9, C3D10)
            • Hydrants, sprinklers and fire services worked out for the building (Part E1)
            Check my drawing free10 sheet reads free · no credit card
            Do this on the drawing, not in a spreadsheet

            Upload a floor plan and get every one of these checks, and 30 more, pinned on the sheet.

            CodeLens Studio reads your floor plans, door schedules and window schedules, runs the NCC checks and shows each issue on the drawing with the clause, what it measured, the limit and the fix.

            34 NCC clausesEgress, fire, services, access, amenity and energy, in NCC 2025, 2022 and 2019.
            Revisions comparedSee what's fixed, what's new and what's still open between revisions.
            Reports and RFIsA report under your logo, and replies to the surveyor's comments drafted for you.
            Free to try10 sheet reads and a finished sample project. No credit card.
            Start free trial See pricing
            FAQ

            Questions about these calculations

            How do I calculate the number of people in a building under the NCC?

            NCC 2025 D2D18 calculates the number of persons on a storey by dividing the floor area of each use by the area per person in Table D2D18, for example 10 m² per person for offices, 1 m² for cafes and restaurants, 3 m² for shops at ground level and 2 m² for classrooms, rounding up. Corridors, toilets and lift lobbies aren't counted. If the actual number of people will be higher, use that instead.

            How many exits does a storey need under NCC D2D3?

            Every storey needs at least one exit. Class 2 to 8 buildings need at least 2 exits from each storey when the effective height is over 25 m. Class 9 buildings need 2 exits when the rise in storeys is over 6 or the effective height is over 25 m, and from any storey accommodating more than 50 persons, patient care areas, early childhood centres and schools with a rise of 2 or more storeys. Storeys where egress involves a vertical rise of more than 1.5 m need 2 exits unless they're no more than 50 m² with no more than 20 m of travel to a single exit.

            How wide do exits need to be under NCC D2D8?

            For up to 100 persons the aggregate exit width is 1 m. From 101 to 200 persons it's 1 m plus 250 mm for each 25 persons (or part) over 100. Over 200 persons it's 2 m plus 500 mm for each 60 persons (or part) over 200 where egress is by stairs or a steep ramp, or each 75 persons otherwise. Doorways in exits can be 250 mm narrower than the required width, down to 750 mm clear (D2D9).

            What are the NCC travel distance limits for offices and shops?

            Under D2D5(3) for Class 5 to 9 buildings, no point on a floor may be more than 20 m from an exit or a point of choice to 2 exits, and then no more than 40 m to one of those exits. Where there's a single exit at road level or open space, the limit is 30 m. Class 2 and 3 buildings have a 6 m limit from apartment doors, and Class 9a patient care areas 12 m to a point of choice.

            How many toilets do employees need under NCC F4D4?

            For employees in Class 3, 5, 6 and 9 buildings (Table F4D4a): male closet pans 1 per 20, urinals none up to 10 males, 1 for 11 to 25, 2 for 26 to 50 and 1 more per 50 after that, washbasins 1 per 30, and female closet pans 1 per 15. Class 7 and 8 buildings (Table F4D4b) need washbasins at 1 per 20. Up to 10 employees can share a unisex facility. Shops, cafes, theatres and schools also need patron or student facilities from the other F4D4 tables.

            How is solar admittance calculated for Section J?

            Under Specification 37 (S37C5), a facade's solar admittance is each glazing element's area times its shading multiplier times its total system SHGC, added up and divided by the facade's total wall-glazing area. It must not exceed the J4D6 limit for the climate zone, aspect and building class. If one facade fails, Method 2 (S37C6) can still pass the building as a whole by weighting each facade.

            How do eaves and fins change the shading multiplier?

            Tables S37C7a and S37C7b give the multiplier for a horizontal projection from the ratio of its projection P to the window height H, and the gap G above the window. Tables S37C7c to S37C7e (NCC 2025 only) give it for vertical fins from the fin depth and the window's width and height. A qualifying external screen, shutter or blind is 0.35. Where more than one applies, the lowest is used.

            Are these calculators free? Do I need to sign up?

            They're free and need no sign-up. They run entirely in your browser, so nothing you type is sent to us. They cover NCC 2025 (and NCC 2022 for glazing). CodeLens Studio, the paid application, reads your actual drawings and runs these checks and 30 more, with NCC 2022 and 2019 and state variations.

            Can I rely on these results for a building permit?

            No. They're design-stage aids based on the Deemed-to-Satisfy provisions, using the values you enter. Always check the official NCC text, state variations and referenced standards. The relevant building surveyor or certifier decides whether a design complies.

            Based on NCC 2025 Volume One (and NCC 2022 Specification 37 for glazing), Australian Building Codes Board, ncc.abcb.gov.au. Clause wording is paraphrased. Design aid only; not a compliance certificate.