ABCB Housing Provisions 2022
Part 10.8 Condensation management
4 clauses · Open on NCC Online ↗
- 10.8.1 External wall constructionWhere a pliable building membrane is installed in an external wall, it must— comply with AS 4200.1; and be installed in accordance with AS 4200.2;…
- 10.8.2 Exhaust systemsAn exhaust system installed in a kitchen, bathroom, sanitary compartment or laundry must have a minimum flow rate of— 25 L/s for a bathroom or…
- Table 10.8.3 Roof space ventilation requirementsRoof pitch | Ventilation openings < 10° | 25,000 mm2/m provided at each of two opposing ends ≥ 10° and < 15° | 25,000 mm2/m provided at the eaves…
- 10.8.3 Ventilation of roof spacesIn climate zones 6, 7 and 8, a roof must have a roof space that— is located— immediately above the primary insulation layer; or immediately above…