Table · ABCB Housing Provisions 2022

Table 1.7 Information guide

How to use the Housing Provisions

Open Table 1.7 on NCC Online ↗
StageRelevant partReference(s)
Initial design considerationsEarthworks3.2
Fire Safety9
Facilities10.4
Room heights10.3
Light and ventilation10.5, 10.6
Stairway and ramp construction11.2
Energy efficiency13
Site preparation and drainage3.1, 3.3
Footings and slabs4
Masonry5
Framing6
Roof cladding, gutters and downpipes and wall cladding7
Gutters and downpipes7.4
Glazing8
Barriers and handrails11.3
Livable housing designH8 (NCC Volume Two)
Construction issuesWet areas and external waterproofing10.2
Sound insulation10.7
Condensation management10.8
Swimming poolsH7D2 (NCC Volume Two)
Termite risk management3.4
Earth retaining structuresH1D3 (NCC Volume Two)
Subfloor ventilation6.2
Smoke alarms and evacuation lighting9.5
Boilers, pressure vessels, heating appliances, fireplaces, chimneys and flues12.4
Special requirementsEarthquake areas2
Flood hazard areasH1D10 (NCC Volume Two)
Construction in bushfire areasH7D4 (NCC Volume Two)
Construction in alpine areas12.2
Attachment of decks and balconies to external walls of buildings12.3
High wind areas2
Class 10 buildings and structuresVarious
Changed in NCC 2025 (minor wording). See ABCB Housing Provisions 2025 Table 1.7, or show what changed.

Stage | Relevant part | Reference(s) Initial design considerations | … design | H8 (NCC Volume Two) Construction issues | Wet areas and external area waterproofing | 10.2 Sound insulation | 10.7 Condensation management | … areas | 2 Class 10 buildings and structures | Various

Removed words are struck through; added words are highlighted. Comparison of the text only.

Defined terms used