Performance Requirement · NCC 2022 Volume One

E1P6 Fire control centres

Part E1 Fire fighting equipment · NCC 2019: EP1.6

Open E1P6 on NCC Online ↗

Suitable facilities must be provided to the degree necessary in a building to co-ordinate fire brigade intervention during an emergency appropriate to—

the function or use of the building; and

the floor area of the building; and

the height of the building.

Same wording in NCC 2025 Volume One. See NCC 2025 Volume One E1P6.

Defined terms used