Deemed-to-Satisfy Provision · NCC 2022 Volume Three
B4D1 Deemed-to-Satisfy Provisions
Part B4 Fire-fighting water services · NCC 2019: B4.1
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B4P1 to B4P4 are satisfied by complying with B4D2 to B4D6.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Same wording in NCC 2025 Volume Three. See NCC 2025 Volume Three B4D1.
Clauses referred to
- B4P1 Flow rate and pressure
- B4P4 Uncontrolled discharge
- B4D2 General requirements
- B4D6 Bushfire prone areas
- A2G2 Performance Solution
- A2G4 A combination of solutions