Performance Requirement · NCC 2022 Volume Three
B5P1 Contamination control
Part B5 Cross-connection control · NCC 2019: BP5.1
Water services must be designed, constructed and installed to avoid contamination.
Applications
B5P1 applies to cold water, heated water, non-drinking water and fire-fighting water services.
Same wording in NCC 2025 Volume Three. See NCC 2025 Volume Three B5P1.