Specification clause · NCC 2022 Volume Three
S2C4 Gypsum-sand mortar and plaster
Specification 2 Descriptions of elements referred to in Specification 1 · NCC 2019: Sch. 5 (Annex): 1.3
Gypsum-sand mortar and gypsum-sand plaster must consist of either—
not more than 3 parts by volume of sand to 1 part by volume of gypsum; or
if lime putty is added, not more than 2.5 parts by volume of sand to 1 part by volume of gypsum and not more than 5% of lime putty by volume of the mixed ingredients.
Same wording in NCC 2025 Volume Three. See NCC 2025 Volume Three S2C4.