Table · NCC 2022 Volume Two

Table H7V2 Annual Probability of Exceedance (APE) for design bushfire actions

Part H7 Ancillary provisions and additional construction requirements

Open Table H7V2 on NCC Online ↗
Importance LevelComplex analysis APE for bushfire exposureSimple analysis APE for weather conditions (design bushfire)
1No requirementNo requirement
21:5001:50
3N/A for Class 1 and 10 buildingsN/A for Class 1 and 10 buildings
41:20001:200

Table Notes

Complex analysis must consider the probability of ignition, fire spread to the urban interface and penetration of the urban interface coincident with fire weather conditions.

Table for H7V2 Buildings in bushfire prone areas

Same wording in NCC 2025 Volume Two. See NCC 2025 Volume Two Table H7V2.

Defined terms used