Housing Provisions clause · ABCB Housing Provisions 2025

10.2.27 Bond breaker installation for bonded membranes

Part 10.2 Wet area waterproofing

Open 10.2.27 on NCC Online ↗

(1) Bond breakers must be installed at all wall/wall, wall/floor, hob /wall junctions and at movement joints where the membrane is bonded to the substrate.

(2) Bond breakers must be of the type compatible with the flexibility class of the membrane to be used.

Same wording in ABCB Housing Provisions 2022. See ABCB Housing Provisions 2022 10.2.27.

Defined terms used