ABCB Housing Provisions 2025
Definitions
402 defined terms.
A B C D E F G H I J K L M N O P R S T U V W Y Z
A
- Above ground rainwater tankA rainwater tank that is not in any way set into the ground.
- AccessibleHaving features to enable use by people with a disability.
- AccesswayA continuous accessible path of travel (as defined in AS 1428.1) to, into or within a building.
- Accredited Testing LaboratoryOne of the following: An organisation accredited by the National Association of Testing Authorities…
- Activity support levelThe degree to which occupants can undertake activities with respect to the likely activity traits and…
- Activity traitsFor the purposes of— Volume One, the features of the activities that will be undertaken in a habitable room…
- Administering bodyThe body responsible for administering the WaterMark Certification Scheme.
- Aged care buildingA Class 9c building for residential accommodation of aged persons who, due to varying degrees of incapacity…
- Agriculture (SA)Cropping, grazing, animal husbandry, intensive animal keeping, horticulture, aquaculture, wool shearing or…
- Air-conditioningFor the purposes of Section J of Volume One, a service that actively cools or heats the air within a space,…
- Aisle (NSW)A walkway at the end of rows of seating, not being continental seating, leading to a cross-over or to an…
- Alarm zoneFor the purposes of Specification 23, an area of a building protected by one or more smoke alarms connected…
- AllotmentAn area of land shown on an approved plan of subdivision for which a separate title is held or issued.
- Alpine areaAn area given in Figure 1 and in Table 1 for specific locations, and is— likely to be subject to significant…
- AlterationIn relation to a building, includes an addition or extension to a building.
- Aluminium Composite Panel (ACP)Flat or profiled aluminium sheet material in composite with any type of materials. ACP
- AmenityAn attribute which contributes to the health, physical independence, comfort and well-being of people.
- Ancillary componentsA component of the building that is not required to ensure the stability of the building or structure as a…
- Ancillary elementAn element that is secondary to and not an integral part of another element to which it is attached.
- Annual exceedance probabilityThe probability that a given rainfall total accumulated over a given duration will be exceeded in any one…
- Annual greenhouse gas emissionsThe theoretical amount of greenhouse gas emissions attributable to the energy used annually by a building's…
- Appropriate authorityFor the purposes of the Fire Safety Verification Method, means the relevant authority with the statutory…
- Appropriate authorityThe relevant authority with the statutory responsibility to determine the particular matter.
- Appropriately qualified personA person recognised by the appropriate authority as having qualifications and/or experience in the relevant…
- Approved disposal systemA system for the disposal of sewage, sullage or stormwater approved by an authority having jurisdiction.
- Articulated masonryMasonry construction in which special provisions have been made for movement by articulation.
- Assembly buildingA building where people may assemble for— civic, theatrical, social, political or religious purposes…
- Assessment MethodA method that can be used for determining that a Performance Solution or Deemed-to-Satisfy Solution complies…
- Assumed cooling thermostat set pointThe cooling thermostat set point used to calculate cooling degree hours, and equal to [formula] , where…
- AtriumA space within a building that connects 2 or more storeys and— is enclosed at the top by a floor or roof…
- Atrium wellA space in an atrium bounded by the perimeter of the openings in the floors or by the perimeter of the…
- Auditorium (NSW)A part of an entertainment venue used or intended to be used for the purposes of accommodating an audience…
- AutomaticDesigned to operate when activated by a heat, smoke or fire sensing device.
- Available safe egress time (ASET)The time between ignition of a fire and the onset of untenable conditions in a specific part of a building.…
- Average daylight factorThe ratio of the illumination level within a room provided by daylight to the level of daylight outside the…
- Average specific extinction areaThe average specific extinction area for smoke as determined by AS 5637.1.
B
- Backflow prevention deviceAn air gap, break tank or mechanical device that is designed to prevent the unplanned reversal of flow of…
- BackpressureA reversal of water flow caused by the downstream pressure becoming greater than the supply pressure.
- BacksiphonageA reversal of flow of water caused by negative pressure in the distributing pipes of a water service or…
- BackstageA space associated with, and adjacent to, a stage in a Class 9b building for scenery, props, equipment,…
- Battery systemOne or more chemical cells connected in series, parallel or a combination of the two for the purpose of…
- BlockageAn obstruction within a water service or sanitary plumbing or drainage system.
- BoilerA vessel or an arrangement of vessels and interconnecting parts, wherein steam or other vapour is generated,…
- Bond breakerA material used as part of a waterproofing system that prevents the membrane bonding to the substrate,…
- Breaking surfAny area of salt water in which waves break on an average of at least 4 days per week but does not include…
- Brush fence (SA)A fence or gate that is primarily constructed of Broombrush (Melalueca Uncinata).
- Building complexity criteriaAre used to determine the building complexity level of all or part of a building in accordance with Table 2,…
- Bulk grain storage facility (SA)A building or structure used for the commercial bulk handling or storage of granular materials such as…
- Buried rainwater tankA rainwater tank that is set into and completely covered by earth.
- BurnoutExposure to fire for a time that includes fire growth, full development, and decay in the absence of…
C
- CarparkA building that is used for the parking of motor vehicles but is neither a private garage nor used for the…
- CavityA void between 2 leaves of masonry, or a void between the cladding and the supporting frame, the primary…
- Cavity wallFor the purposes of F1V1 and H2V1, a wall that incorporates a drained cavity.
- Cell type silo (SA)A type of bulk grain storage facility similar to that illustrated in diagram (a) of Figure SA 1.
- Centre-based care class 4 facility (TAS)A facility as defined in Centre Based Care Class 4 Standards.
- Centre-based care class 5 facility (TAS)A facility as defined in Centre Based Care Class 5 Standards.
- Certificate of AccreditationA certificate issued by a State or Territory accreditation authority stating that the properties and…
- Certificate of ConformityA certificate issued under the ABCB scheme for products and systems certification stating that the…
- Certification bodyA person or organisation operating in the field of material, product, form of construction or design…
- CharacteristicThe occupant data to be used in the modelling of access solutions which define how an occupant interacts…
- Children’s room (VIC)a room used exclusively for the care or education of children while the children are attending the service,…
- Clad frameTimber or metal frame construction with exterior timber or sheet wall cladding that is not sensitive to…
- Climate specific part load valueA metric for the efficiency of a connected group of chillers that accounts for the Energy Efficiency Ratio…
- Climate zoneAn area defined in Figure 2 and in Table 3 for specific locations, having energy efficiency provisions based…
- CollectedFor the purposes of Section F in NCC Volume One, the interception of water — on the surface or sub-surface…
- CombustibleApplied to— a material — means combustible as determined by an Accredited Testing Laboratory in accordance…
- Combustible cladding product (VIC)Means— aluminium composite panels (ACPs) with a core of less than 93% inert mineral filler (inert content)…
- Common wallFor the purposes of— Volume One, a wall that is common to adjoining buildings. Volume Two and the ABCB…
- CondensationThe formation of liquid water on the surface of a building element or material as a result of moist air…
- Conditioned spaceFor the purposes of— Volume One, a space within a building, including a ceiling or under-floor supply air…
- Construction activity actionsActions due to stacking of building materials or the use of equipment, including cranes and trucks, during…
- Containment protectionThe installation of a backflow prevention device at the point of connection of a Network Utility Operator’s…
- ContaminantAny substance (including gases, liquids, solids or micro-organisms), energy (excluding noise) or heat, that…
- Continental seating (NSW)Rows of seating in which the rows extend the full width of an auditorium without intervening aisles.
- Control layerAny continuous layer that is installed for one or more of the purposes of air, water, vapour or thermal…
- Controlled fillMaterial that has been placed and compacted in layers with compaction equipment (such as a vibrating plate)…
- Cooling degree hoursFor any one hour when the mean outdoor air temperature is above the assumed cooling thermostat set point,…
- Cooling loadThe calculated amount of energy removed from the cooled spaces of the building annually by artificial means…
- Critical radiant flux (CRF)The critical heat flux at extinguishment (CHF in kW/m2) as determined by an Accredited Testing Laboratory in…
- Cross-connectionAny actual or potential connection between a water supply and any contaminant.
- Cross-over (NSW)In relation to an entertainment venue or temporary structure, means a walkway between aisles or between an…
- Curtain wallA non-load bearing external wall that is not a panel wall.
D
- Daily outdoor temperature rangeThe difference between the maximum and minimum temperatures that occur in a day.
- Damp-proof course (DPC)A continuous layer of impervious material placed in a masonry wall or pier, or between a wall or pier and a…
- Deemed-to-Satisfy ProvisionsProvisions which are deemed to satisfy the Performance Requirements.
- Deemed-to-Satisfy SolutionA method of satisfying the Deemed-to-Satisfy Provisions.
- Defined flood event (DFE)The flood event selected for the management of flood hazard for the location of specific development as…
- Defined flood level (DFL)The flood level associated with a defined flood event relative to a specified datum (see Figure 3). Figure 3…
- Dehumidification gram hoursFor any one hour when the mean humidity is more than 15.7g/kg, the grams per kilogram of absolute humidity…
- Design bushfireThe characteristics of a bushfire, its initiation, spread and development, which arises from weather…
- Design fireThe quantitative description of a representation of a fire within the design scenario.
- Design scenarioThe specific scenario of which the sequence of events is quantified and a fire safety engineering analysis…
- Design wind speedThe design gust wind speed for the area where the building is located, calculated in accordance with AS/NZS…
- Designated bushfire prone areaLand which has been designated under a power of legislation as being subject, or likely to be subject, to…
- Detention centreA building in which persons are securely detained by means of the built structure including a prison, remand…
- Development consent (NSW)Is as defined in the Environmental Planning and Assessment Act 1979.
- Direct fix cladding wallFor the purposes of F1V1 and H2V1, means a wall with cladding attached directly to the wall framing without…
- Discontinuous constructionMeans— a wall having a minimum 20 mm cavity between 2 separate leaves, and— for masonry, where wall ties are…
- Display glazingGlazing used to display retail goods in a shop or showroom directly adjacent to a walkway or footpath, but…
- Domestic servicesThe basic engineering systems that use energy or control the use of energy; and— includes— heating,…
- DrainageAny part of— a sanitary drainage system, including any liquid trade waste drainage; or a stormwater drainage…
- Drainage flangeA flange connected to a waste pipe, at the point at which it passes through the floor substrate, to prevent…
- Drainage riserA waste pipe between the floor waste and the drainage system.
- Drainage systemA system that— conveys water by gravity, mechanical means, or evaporation to a point of discharge or…
- DrainedFor the purposes of Section F in NCC Volume One, the removal to a drainage system, water that has been…
- Drinking waterWater intended primarily for human consumption but which has other domestic uses.
E
- Early childhood centreAny premises or part thereof providing or intending to provide a centre-based education and care service…
- Effective heightThe vertical distance between the floor of the lowest storey included in the calculation of rise in storeys…
- EfficacyThe degree to which a system achieves a design objective given that it performs to a level consistent with…
- Electric passenger liftA power-operated lift for raising or lowering people in a car in which the motion of the car is obtained…
- Electricity network substationA building in which high voltage supply is converted or transformed and which is controlled by a licensed…
- Electrohydraulic passenger liftA power-operated lift for raising or lowering people in a car in which the motion of the car is obtained…
- Energy valueThe net cost to society including, but not limited to, costs to the building user, the environment and…
- Engaged pierA pier bonded to a masonry wall by course bonding of masonry units or by masonry ties.
- Entertainment venue (NSW)Is as defined in the Environmental Planning and Assessment Regulation 2021.
- EnvelopeFor the purposes of— Section J and Part F8 in NCC Volume One, the parts of a building’s fabric that separate…
- EquivalentEquivalent to the level of health, safety and amenity provided by the Deemed-to-Satisfy Provisions.
- Evacuation routeThe continuous path of travel (including exits, public corridors and the like) from any part of a building,…
- Evacuation timeThe time calculated from when the emergency starts for the occupants of the building to evacuate to a safe…
- Existing building (WA)For the purpose of Part H6, an existing Class 1 building or an existing attached Class 10 part that was not…
- ExitMeans— Any, or any combination of the following if they provide egress to a road or open space: An internal…
- Expert judgementThe judgement of an expert who has the qualifications and experience to determine whether a Performance…
- External wallFor the purposes of— Volume One, an outer wall of a building which is not a common wall; or Volume Two, an…
- Extra-low voltageA voltage not exceeding 50 V AC or 120 V ripple-free DC.
F
- FabricThe basic building structural elements and components of a building including the roof, ceilings, walls,…
- Farm buildingA Class 7 or 8 building located on land primarily used for farming — that is— used in connection with…
- Farm shedA single storey Class 7 or 8 building located on land primarily used for farming — that is— used in…
- Farm vehicleA vehicle used in connection with farming.
- FarmingIncludes— cultivating, propagating and harvesting plants or fungi or their products or parts, including…
- Film (NSW)A cinematograph film of a size of 35 mm or greater.
- Finished ground levelThe ground level adjacent to footing systems at the completion of construction and landscaping.
- Fire actionsEach of the following: airborne embers; and burning debris and/or accumulated embers adjacent to building…
- Fire brigadeA statutory authority constituted under an Act of Parliament having as one of its functions, the protection…
- Fire brigade stationFor the purposes of E1D2(1)(b) and I3D9, means a state or territory government operated premises which is a…
- Fire compartmentEither— the total space of a building; or when referred to in— the Performance Requirements — any part of a…
- Fire growthThe stage of fire development during which the heat release rate and the temperature of the fire are…
- Fire hazardThe danger in terms of potential harm and degree of exposure arising from the start and spread of fire and…
- Fire hazard propertiesThe following properties of a material or assembly that indicate how they behave under specific fire test…
- Fire intensityThe rate of release of calorific energy in watts, determined either theoretically or empirically, as…
- Fire loadThe sum of the net calorific values of the combustible contents which can reasonably be expected to burn…
- Fire safety engineeringApplication of engineering principles, rules and expert judgement based on a scientific appreciation of the…
- Fire safety systemOne or any combination of the methods used in a building to— warn people of an emergency; or provide for…
- Fire wallA wall with an appropriate resistance to the spread of fire that divides a storey or building into fire…
- Fire-isolated passagewayA corridor, hallway or the like, of fire-resisting construction, which provides egress to or from a…
- Fire-isolated rampA ramp within a fire-resisting enclosure which provides egress from a storey.
- Fire-isolated stairwayA stairway within a fire-resisting shaft and includes the floor and roof or top enclosing structure.
- Fire-protected steelLoadbearing wall construction comprising hot rolled or cold formed steel members protected with a…
- Fire-protected timberFire-resisting timber building elements that comply with Specification 10.
- Fire-protective coveringAny one or more of the following: 13 mm fire-protective grade plasterboard. 12 mm cellulose cement flat…
- Fire-resistance level (FRL)The grading periods in minutes determined in accordance with Specifications 1 and 2, for the following…
- Fire-resistingFor the purposes of— Volume One, applied to a building element, having an FRL appropriate for that element;…
- Fire-resisting constructionFor the purposes of Volume One, means one of the Types of construction referred to in Part C2 of Volume One.
- Fire-source featureAny one or more of the following: The far boundary of a road, river, lake or the like adjoining the…
- Fixed wiredFor the purposes of Specification 23, a system of electrical wiring (either AC or DC), in which cables are…
- Flammability IndexThe index number as determined by an Accredited Testing Laboratory in accordance with AS 1530.2. Notes Until…
- FlashingA strip or sleeve of impervious material dressed, fitted or built-in to provide a barrier to water movement,…
- FlashoverIn relation to fire hazard properties, means a heat release rate of 1 MW.
- FlightThat part of a stair that has a continuous series of risers, including risers of winders, not interrupted by…
- Flood hazard areaThe site (whether or not mapped) encompassing land lower than the flood hazard level which has been…
- Flood hazard level (FHL)The flood level used to determine the height of floors in a building and represents the defined flood level…
- Floor areaFor the purposes of— Volume One— in relation to a building — the total area of all storeys; and in relation…
- Floor wasteA grated inlet within a graded floor intended to drain the floor surface.
- Flying scenery (NSW)Scenery of a kind that is lifted above the stage floor by means of lines run from a grid.
- FoundationThe ground which supports the building (see Figure 5). Figure 5 Identification of foundation
- Fractional effective dose (FED)The fraction of the dose (of thermal effects) that would render a person of average susceptibility incapable…
- FreeboardThe height above the defined flood level as determined by the appropriate authority, used to compensate for…
- Fully developed fireThe state of total involvement of the majority of available combustible materials in a fire.
G
- Garage top dwelling (NSW)A Class 1a dwelling located above a Class 10a private garage which is not associated with that Class 1a…
- GlazingFor the purposes of— Section J of Volume One, except for a sole-occupancy unit of a Class 2 building or a…
- GoingThe horizontal dimension from the front to the back of a tread less any overhang from the next tread or…
- Green StarThe building sustainability rating scheme managed by the Green Building Council of Australia.
- Grid (NSW)A framework from which lines are run for the purpose of lifting flying scenery above the stage floor.
- Group numberThe number of one of 4 groups of materials used in the regulation of fire hazard properties and applied to…
H
- Habitable roomA room used for normal domestic activities, and— includes a bedroom, living room, lounge room, music room,…
- Hazard RatingA level of potential toxicity that may cause contamination in a drinking water system, having a rating of…
- Health-care buildingA building whose occupants or patients undergoing medical treatment generally need physical assistance to…
- Heat releaseThe thermal energy produced by combustion (measured in kJ).
- Heat release rate (HRR)The rate of thermal energy production generated by combustion, measured in kW (preferred) or MW. HRR
- Heated waterWater that has been intentionally heated; normally referred to as hot water or warm water.
- Heating degree hoursFor any one hour when the mean outdoor air temperature is less than 15°C, the degrees Celsius temperature…
- Heating loadThe calculated amount of energy delivered to the heated spaces of the building annually by artificial means…
- High HazardAny condition, device or practice which, in connection with a water supply, has the potential to cause death.
- High wind areaA region that is subject to design wind speed more than N3 or C1 (see Table 4).
- HobThe upstand at the perimeter of a shower area.
- Horizontal exitA required doorway between 2 parts of a building separated from each other by a fire wall.
- Hotel offering shared accommodation (VIC)A hotel which has any sole-occupancy units that can be shared by unrelated persons.
- Hours of operationThe number of hours when the occupancy of the building is at least 20% of the peak occupancy.
- House energy rating softwareFor the purposes of— Volume One, applied to J3D3 or J3D15 — software accredited under the Nationwide House…
I
- IlluminanceThe luminous flux falling onto a unit area of surface.
- Illumination power densityThe total of the power that will be consumed by the lights in a space, including any lamps, ballasts,…
- Inclined liftA power-operated device for raising or lowering people within a carriage that has one or more rigid guides…
- Individual protectionThe installation of a backflow prevention device at the point where a water service connects to a single…
- Information and education facility (NSW)Is as defined in the Standard Instrument—Principal Local Environment Plan.
- InsulationIn relation to an FRL, the ability to maintain a temperature on the surface not exposed to the furnace below…
- IntegrityIn relation to an FRL, the ability to resist the passage of flames and hot gases specified in AS 1530.4.
- Internal wallFor the purposes of— Volume One, excludes a common wall or a party wall; or Volume Two, excludes a…
- Interstitial condensationThe condensation of moisture on surfaces between material layers inside the building component.
- Irrigation systemAn irrigation system of the following types: Type A— all permanently open outlets and piping more than 150…
J
- JASANZThe Joint Accreditation System of Australia and New Zealand.
K
- Kerb rampA ramp incorporated in a kerb.
L
- Lamp power densityThe total of the maximum power rating of the lamps in a space, other than those that are plugged into socket…
- LandingAn area at the top or bottom of a flight or between two flights.
- Latent heat gainThe heat gained by the vapourising of liquid without change of temperature.
- Lateral supportA support (including a footing, buttress, cross wall, beam, floor or braced roof structure) that effectively…
- Lead freeWhere a plumbing product or material in contact with drinking water has a weighted average lead content of…
- Licensed premises (NSW)Is as defined in the Liquor Act 2007.
- Licensed premises (WA)Includes— premises in respect of which a cabaret licence as defined by the Liquor Control Act 1988 has been…
- Lightweight constructionConstruction which incorporates or comprises— sheet or board material, plaster, render, sprayed application,…
- LoadbearingIntended to resist vertical forces additional to those due to its own weight.
- Loadbearing wallFor the purposes of H1D4 and H2D3 of NCC Volume Two and Section 4 of the ABCB Housing Provisions, means any…
- LossPhysical damage, financial loss or loss of amenity.
- Low HazardAny condition, device or practice which, in connection with a water supply, would constitute a nuisance by…
- Low rainfall intensity areaAn area with a 5 minute rainfall intensity for an annual exceedance probability of 5% of not more than 125…
- Low voltageA voltage exceeding extra-low voltage, but not exceeding 1000 V AC or 1500 V DC.
- Low-rise platform liftA power-operated device for raising or lowering people with limited mobility on a platform, that is…
- Low-rise, low-speed constant pressure liftA power-operated low-rise, low-speed device for raising or lowering people with limited mobility on a…
- Luminance contrastThe light reflected from one surface or component, compared to the light reflected from another surface or…
M
- Main space conditioningEither— the heating or cooling equipment that serves at least 70% of the conditioned space of a dwelling; or…
- Main water heaterThe domestic hot water unit in a dwelling that is connected to at least one shower and the largest number of…
- Massive timberAn element not less than 75 mm thick as measured in each direction formed from solid and laminated timber.
- Maximum retained water levelThe point where surface water will start to overflow out of the shower area.
- Medium HazardAny condition, device or practice which, in connection with a water supply, has the potential to injure or…
- MembraneA barrier impervious to moisture.
- MezzanineAn intermediate floor within a room, that is not separated from that room by walls.
- Minimum Energy Performance Standards (MEPS)The Minimum Energy Performance Standards for equipment and appliances established through the Greenhouse and…
- Minimum lateral clearance (NSW)A permanently unobstructed space having a height above floor level of not less than 2000 mm and a width of…
- Mixed constructionA building consisting of more than one form of construction, particularly in double-storey buildings.
- MouldA fungal growth that can be produced from conditions such as dampness, darkness, or poor ventilation.
N
- NABERS EnergyThe National Australian Built Environment Rating Systems for energy efficiency, which is managed by the New…
- Network Utility OperatorA person who— undertakes the piped distribution of drinking water or non-drinking water for supply; or is…
- Non-combustibleApplied to— a material — means not deemed combustible as determined by an Accredited Testing Laboratory in…
- Non-drinking waterWater which is not intended primarily for human consumption.
O
- Occupant traitsFor the purposes of— Volume One, the features, needs and profile of the occupants in a habitable room or…
- Occupiable outdoor areaA space on a roof, balcony or similar part of a building— that is open to the sky; and to which access is…
- On-site wastewater management systemA system that receives and/or treats wastewater generated and discharges the resulting effluent to an…
- Open spaceA space on the allotment, or a roof or similar part of a building adequately protected from fire, open to…
- Open spectator standA tiered stand substantially open at the front.
- Open-deck carparkA carpark in which all parts of the parking storeys are cross-ventilated by permanent unobstructed openings…
- Other propertyAll or any of the following— any building on the same or an adjoining allotment; and any adjoining…
- Outdoor airAir outside the building.
- Outdoor air economy cycleA mode of operation of an air-conditioning system that, when the outdoor air thermodynamic properties are…
- OutfallThat part of the disposal system receiving surface water from the drainage system and may include a natural…
- Overflow deviceA device that provides relief to a water service, sanitary plumbing and drainage system, rainwater service…
P
- Panel wallA non-load bearing external wall, in frame or similar construction, that is wholly supported at each storey.
- Partially buried rainwater tankA rainwater tank that is not completely covered by earth but is partially set into the ground.
- Patient care areaA part of a health-care building normally used for the treatment, care, accommodation, recreation, dining…
- Performance RequirementA requirement which states the level of performance which a Performance Solution or Deemed-to-Satisfy…
- Performance SolutionA method of complying with the Performance Requirements other than by a Deemed-to-Satisfy Solution.
- Performance-based design brief (PBDB)The report that defines the scope of work for the performance-based analysis, the technical basis for…
- Perimeter of buildingFor the purposes of Section 8 of the Housing Provisions, means the external envelope of a building.
- Permit Authority (TAS)A permit authority as defined in the Building Act 2016.
- Personal care servicesAny of the following: The provision of nursing care. Assistance or supervision in— bathing, showering or…
- PipingFor the purposes of Section J in Volume One or Part H6 in Volume Two, and Section 13 of the Housing…
- Planning for Bush Fire Protection (NSW)Is as prescribed by the Environmental Planning and Assessment Regulation 2021.
- Pliable building membraneA water barrier as classified by AS 4200.1.
- PlumbingAny water service plumbing or sanitary plumbing system.
- Plumbing or Drainage SolutionA solution which complies with the Performance Requirement and is a— Performance Solution; or…
- Point of connectionAny of the following: For a cold water service, means the point where the cold water service connects to—…
- Predicted Mean Vote (PMV)The Predicted Mean Vote of the thermal perception of building occupants determined in accordance with…
- Preformed shower baseA preformed, prefinished vessel installed as the finished floor of a shower compartment, and which is…
- Pressure vesselA vessel subject to internal or external pressure, including interconnected parts and components, valves,…
- Primary building elementFor the purposes of— Volume One, a member of a building designed specifically to take part of the loads…
- Primary insulation layerThe most interior insulation layer of a wall or roof construction.
- Private bushfire shelterA structure associated with, but not attached to, or part of a Class 1a dwelling that may, as a last resort,…
- Private garageFor the purposes of— Volume One— any garage associated with a Class 1 building; or any single storey of a…
- ProductPlumbing and drainage items within the scope of Volume Three including but not limited to— materials,…
- Product Technical StatementA form of documentary evidence stating that the properties and performance of a building material, product…
- Professional engineerA person who is— if legislation is applicable — a registered professional engineer in the relevant…
- Projection suite (NSW)Such part of an entertainment venue as is designed to accommodate apparatus used for projecting films.
- Public (TAS)Includes any person working in an enclosed public place.
- Public corridorAn enclosed corridor, hallway or the like which— serves as a means of egress from 2 or more sole-occupancy…
R
- R-ValueThe thermal resistance of a component calculated by dividing its thickness by its thermal conductivity,…
- RainwaterNaturally occurring water generated by a rain or storm event.
- Rainwater serviceA water service which distributes water from the isolation valve of the rainwater storage to the rainwater…
- Rainwater storageAny storage of rainwater collected from a roof catchment area which is used to supply water for the primary…
- Rainwater tank (SA)A vessel for the storage of surface water collected from the roof catchment area of the building.
- Rapid roller doorA door that opens and closes at a speed of not less than 0.5 m/s.
- Recognised expertA person with qualifications and experience in the area of plumbing or drainage in question recognised by…
- RedirectedFor the purposes of Section F in NCC Volume One, the changing of direction of collected water to a drainage…
- Reference buildingFor the purposes of— Volume One, a hypothetical building that is used to calculate the maximum allowable—…
- Reflective insulationA building membrane with a reflective surface such as a reflective foil laminate, reflective barrier, foil…
- Regulated energyThe energy consumed by a building's services minus the amount of renewable energy generated and used on site.
- Reinforced masonryMasonry reinforced with steel reinforcement that is placed in a bed joint or grouted into a core to…
- ReliabilityThe probability that a system performs to a level consistent with the system specification.
- Renewable energyEnergy that is derived from sources that are regenerated, replenished, or for all practical purposes cannot…
- RequiredRequired to satisfy a Performance Requirement or a Deemed-to-Satisfy Provision of the NCC as appropriate.
- Required safe egress time (RSET)The time required for safe evacuation of occupants to a place of safety prior to the onset of untenable…
- Resident use areaPart of a Class 9c building normally used by residents, and— includes sole-occupancy units, lounges, dining…
- Residential aged care buildingA Class 3 or 9a building whose residents, due to their incapacity associated with the ageing process, are…
- Residential care buildingA Class 3, 9a or 9c building which is a place of residence where 10% or more of persons who reside there…
- Residential care building (Vic) (VIC)A building which is a place of residence where 10% or more of persons who reside there need physical…
- Resistance to the incipient spread of fireIn relation to a ceiling membrane, means the ability of the membrane to insulate the space between the…
- Restricted children’s service (VIC)A children’s service that is a limited hours service as defined in the Children’s Services Regulations 2020.
- Rise in storeysThe greatest number of storeys calculated in accordance with C2D3 of Volume One.
- RiserThe height between consecutive treads and between each landing and continuous tread.
- Rising dampWater absorbed from the ground into a building element.
- Rolled fillMaterial placed in layers and compacted by repeated rolling by an excavator.
- Roof catchment area (SA)The area of the roof (expressed in square metres), measured on the horizontal (no allowance for slope or…
- Roof lightFor the purposes of Section J and Part F6 in NCC Volume One, Part H6 in NCC Volume Two, and Part 10.5 and…
- Row (NSW)A row of seating— between a wall or other barrier and an aisle; or between 2 aisles.
S
- Safe placeEither— a place of safety within a building— which is not under threat from a fire; and from which people…
- Sanitary compartmentA room or space containing a closet pan or urinal (see Figures 6a and 6b). Figure 6a Identification of a…
- Sarking-type materialA material such as a reflective insulation or other flexible membrane of a type normally used for a purpose…
- SchoolIncludes a primary or secondary school, college, university or similar educational establishment.
- School age care facility (TAS)Is a facility providing care for children (primarily) 5 years or older in an outside of school hours…
- ScreedA layer of material (usually cement based) which sets in situ between a structural base and the finished…
- Self-closingFor the purposes of— Volume One, applied to a door, means equipped with a device which returns the door to…
- Self-drainingA surface finish allowing water to be conveyed by gravity from the finished surface level to the membrane on…
- Sensible heat gainThe heat gained which causes a change in temperature.
- Separating elementA barrier that exhibits fire integrity, structural adequacy, insulation, or a combination of these for a…
- Separating wallA wall that is common to adjoining Class 1 buildings (see Figure 7). Figure 7 Separating wall Figure Notes…
- ServiceFor the purposes of Section J in Volume One, means a mechanical or electrical system that uses energy to…
- Service stationA garage which is not a private garage and is for the servicing of vehicles, other than only washing,…
- ShaftThe walls and other parts of a building bounding— a well, other than an atrium well; or a vertical chute,…
- Shared accommodation building (VIC)A Class 3 building that is a boarding-house, chalet, guest house, lodging-house, backpacker accommodation or…
- Shower areaThe area affected by water from a shower, including a shower over a bath and for a shower area that is—…
- Shower screenThe panels, doors or windows enclosing or partially enclosing a shower area.
- Single leaf masonryOuter walls constructed with a single thickness of masonry unit.
- SiteThe part of the allotment of land on which a building stands or is to be erected.
- SiteworkWork on or around a site, including earthworks, preparatory to or associated with the construction,…
- Small arts venue (SA)The whole or the only part of a building that has a rise in storeys of not more than 2— in which cultural…
- Small live music or arts venue (NSW)The whole or part of a building— in which cultural activities including live music, visual arts’ displays,…
- Small-scale Technology CertificateA certificate issued under the Commonwealth Government's Small-scale Renewable Energy Scheme.
- Smoke development rateThe development rate for smoke as determined by an Accredited Testing Laboratory testing flooring materials…
- Smoke growth rate index (SMOGRA)The index number for smoke used in the regulation of fire hazard properties and applied to materials used as…
- Smoke-and-heat ventA vent, located in or near the roof for smoke and hot gases to escape if there is a fire in the building.
- Smoke-Developed IndexThe index number for smoke as determined by an Accredited Testing Laboratory in accordance with AS/NZS…
- Solar admittanceThe fraction of incident irradiance on a wall-glazing construction that adds heat to a building's space.
- Solar Reflectance IndexThe solar reflectance index calculated in accordance with ASTM E1980-11(2019).
- Sole-occupancy unitA room or other part of a building for occupation by one or joint owner, lessee, tenant, or other occupier…
- Spa pool (NSW)Is as defined in the Swimming Pools Act 1992.
- Spandrel panelFor the purposes of Section J, means the opaque part of a façade in curtain wall construction which is…
- Special fire protection purpose (NSW)(As per Section 100B(6) of the Rural Fires Act 1997) means any of the following purposes: a school, a child…
- Spiral stairwayA stairway with a circular plan, winding around a central post with steps that radiate from a common centre…
- Spread-of-Flame IndexThe index number for spread of flame as determined by an Accredited Testing Laboratory in accordance with…
- Sprinkler alarm switchFor the purposes of Specification 23, a device capable of sending an electrical signal to activate an alarm…
- Stack bonded pierA pier where the overlap of a masonry unit is not more than 25% of the length of the masonry unit below.
- StageA floor or platform in a Class 9b building on which performances are presented before an audience.
- Stairway platform liftA power-operated device for raising or lowering people with limited mobility on a platform (with or without…
- Standard Fire TestThe Fire-resistance Tests of Elements of Building Construction as described in AS 1530.4.
- Step rampA ramp, other than a kerb ramp, not exceeding 190 mm in height.
- Storage shed (SA)A type of bulk grain storage facility similar to that illustrated in diagram (b) of Figure SA 1.
- StoreyA space within a building which is situated between one floor level and the floor level next above, or if…
- StormwaterWater accumulated or discharged as a result of a rain event.
- Structural adequacyIn relation to an FRL, means the ability to maintain stability and adequate load bearing capacity as…
- Structural memberA component or part of an assembly which provides vertical or lateral support to a building or structure.
- Structural substrateThe surface of a structural member to be waterproofed as required by Part F1 or F2D2(2)(a).
- Sub-surface waterIncludes— all naturally occurring water, other than surface water, which is either groundwater or water…
- Surface finishFor the purposes of Section F of Volume One, is a material or flooring system directly fixed to or supported…
- Surface waterAll naturally occurring water, other than sub-surface water, which results from rainfall on or around the…
- Surface water seepageWater escaping through the surface of the ground or a building element.
- Swimming poolAny excavation or structure containing water and principally used, or that is designed, manufactured or…
T
- Tapered treadA stair tread with a walking area that grows smaller towards one end.
- Temporary structure (NSW)Either— a booth, tent or other temporary enclosure, whether or not a part of the booth, tent or enclosure is…
- Temporary structure (TAS)Includes any– booth, tent or other temporary enclosure, whether or not part of the booth, tent or enclosure…
- Thermal comfort levelThe level of thermal comfort in a building expressed as a PMV sensation scale.
- Thermal energy loadThe sum of the heating load and the cooling load.
- Threshold rampA ramp located within or at a threshold.
- Total R-ValueThe sum of the R-Values of the individual component layers in a composite element including any building…
- Total Solar ReflectanceThe complement of the solar absorptance. TSR
- Total System Solar Heat Gain Coefficient (SHGC)For the purposes of— Volume One, the fraction of incident irradiance on a wall-glazing construction or a…
- Total System U-ValueThe thermal transmittance of the composite element allowing for the effect of any airspaces, thermal…
- Treatment areaAn area within a patient care area such as an operating theatre and rooms used for recovery, minor…
U
- Uncontrolled dischargeAny unintentional release of fluid from a plumbing and drainage system and includes leakage and seepage.
- Unique wallFor the purposes of F1V1 in Volume One and H2V1 in Volume Two, a wall which is neither a cavity wall nor a…
- Unobstructed openingFor the purposes of Section 8 of the ABCB Housing Provisions, a glazed area that a person could mistake for…
- Unprotected water serviceUnprotected water service means that the water service may be contaminated from a surrounding hazard.
- Unreinforced masonryMasonry that is not reinforced.
V
- Vapour permeanceThe degree that water vapour is able to diffuse through a material, measured in µg/N.s and tested in…
- Vapour pressureThe pressure at which water vapour is in thermodynamic equilibrium with its condensed state.
- Ventilation openingAn opening in the external wall, floor or roof of a building designed to allow air movement into or out of…
- Verification MethodA test, inspection, calculation or other method that determines whether a Performance Solution complies with…
- VesselFor the purposes of Volume One and Part 10.2 of the ABCB Housing Provisions, an open, pre-formed,…
- VisibilityThe maximum distance at which an object of defined size, brightness and contrast can be seen and recognised.
- VoltageA difference of potential, measured in Volts (V) and includes extra-low voltage and low voltage.
- VolumeIn relation to— a building — the volume of the total space of the building measured above the lowest floor…
W
- WA Public building (WA)A Class 6 licensed premises or Class 9b building where persons may assemble for— civic, theatrical, social,…
- Waffle raftA stiffened raft with closely spaced ribs constructed on the ground and with slab panels supported between…
- Wall-glazing constructionFor the purposes of Section J in Volume One, the combination of wall and glazing components comprising the…
- Ward areaThat part of a patient care area for resident patients and may contain areas for accommodation, sleeping,…
- WaterFor the purposes of Section F of Volume One, includes— surface water; and sub-surface water; and rainwater;…
- Water control layerA pliable building membrane or the exterior cladding when no pliable building membrane is present.
- Water resistantThe property of a system or material that restricts water movement and will not degrade under conditions of…
- Water sensitive materialsMaterials that have an inherent capacity to absorb water vapour and include timber, plasterboard, plywood,…
- Water services overflowWater discharged from water service referred to in the Plumbing Code of Australia not primarily drained by a…
- WaterMark Certification SchemeThe ABCB scheme for certifying and authorising plumbing and drainage products.
- WaterMark Conformity Assessment Body (WMCAB)A conformity assessment body registered with and accredited by the JAS-ANZ to conduct evaluations leading to…
- WaterMark LicenceA licence issued by a WaterMark Conformity Assessment Body.
- WaterMark Schedule of Excluded ProductsThe list maintained by the administering body of products excluded from the WaterMark Certification Scheme.
- WaterMark Schedule of ProductsThe list maintained by the administering body of products included in the WaterMark Certification Scheme,…
- WaterproofThe property of a material that does not allow water to penetrate through it.
- Waterproofing systemA combination of elements that are required to achieve a waterproof barrier as required by H4D2 and H4D3…
- WaterstopA vertical extension of the waterproofing system forming a barrier to prevent the passage of water in a…
- WatertightWill not allow water to pass from the inside to the outside of the component or joint and vice versa.
- Weighted averageIs calculated across the wetted surface area of a pipe, pipe fitting or plumbing fixture.
- WELS (WA)Has the meaning given in the Water Efficiency Labelling and Standards Act 2005 of the Commonwealth.
- Wet areaAn area within a building supplied with water from a water supply system, which includes bathrooms, showers,…
- Wetted surface areaIs calculated by the total sum of diameter (D) in contact with drinking water.
- WindersTreads within a straight flight that are used to change direction of the stair (see Explanatory Figure 1).
- WindowIncludes a roof light, glass panel, glass block or brick, glass louvre, glazed sash, glazed door, or other…
Y
- YieldThe mass of a combustion product generated during combustion divided by the mass loss of the test specimen…
Z
- Zone protectionThe installation of a backflow prevention device at the point where a water service is connected to multiple…