Table · ABCB Housing Provisions 2025

Table 7.5.2 Fixing requirements — Splayed and profiled timber weatherboards

Part 7.5 Timber and composite wall cladding

Open Table 7.5.2 on NCC Online ↗
Wind classMaximum stud spacing (mm)Minimum nominal stud fixings
N1 - N3600Timber: 2.8 G or (8-18) S

Steel: (8-18) S

Table Notes

G = galvanised plain shank, threaded or equivalent nails.

S = self embedding head or wafer head screw.

Fasteners must penetrate not less than 30 mm into timber frames and not less than two full screw threads through steel frames.

Wall cladding may be fixed through timber or metal battens attached to the wall frame in accordance with AS 1684.2, AS 1684.3, AS 1684.4 or NASH standard as appropriate (see fixing requirements for roof battens) so long as the minimum penetration into the wall frame is achieved.

Steel framing members must have a base metal thickness (BMT) not less than that required for a roof batten in NASH standard.

Table for 7.5.2 Timber wall cladding

Same wording in ABCB Housing Provisions 2022. See ABCB Housing Provisions 2022 Table 7.5.2.

Defined terms used