Performance Requirement · NCC 2025 Volume Three

D1P2 Excessive noise

Part D1 Excessive noise · NCC 2019: DP1.2

Open D1P2 on NCC Online ↗

(1) A plumbing and drainage system must reduce the transmission of airborne and/or impact generated sound which may cause illness or loss of amenity to occupants.

(2) The required sound insulation of a floor or wall must not be compromised by the incorporation or penetration of a plumbing or drainage system.

Applications

D1P2 only applies to a plumbing or drainage system that is located in—

a separating wall of a Class 1 building; or

a Class 2, Class 3 or Class 9c building that is required to be sound rated.

Notes

Part F7 in Volume One of the NCC contains Performance Requirements F7P1 through to F7P4 which cover sound transmission and insulation in walls and floors of Class 2, Class 3 and Class 9c buildings.

Part H4 in Volume Two of the NCC contains Performance Requirement H4P6 which covers sound insulation of walls in Class 1 buildings.

Same wording in NCC 2022 Volume Three. See NCC 2022 Volume Three D1P2.

Defined terms used