Tasmania variation · NCC 2025 Volume Three
TAS C4D8 Silt pits
TAS Part C4 On-site liquid trade waste systems
Delete clause C4D8 and insert TAS C4D8 as follows:
(1) The silt pit must be connected and authorised by the Permit Authority.
(2) The silt pit bucket must—
be constructed of mild steel plate, minimum 3 mm thick with 4 rows of 10 mm diameter holes at 25 mm centres: and
be hot dipped galvanised after fabrication.
Changed since NCC 2022. See NCC 2022 Volume Three TAS C4D8, or show what changed.
Delete clause C4D8 and insert TAS C4D8 as follows: (1) The silt pit must be connected and authorised by … 25 mm centres: and be hot dipped galvanised after fabrication.
Removed words are struck through; added words are highlighted. Comparison of the text only.