Definition · NCC 2025 Volume One

Building complexity criteria

Are used to determine the building complexity level of all or part of a building in accordance with Table 2, where building complexity criteria are as follows:

Attributes — the building is designed or constructed with any of the following sub-criteria:

An effective height of more than 25 m.

One or more Performance Solutions are used to demonstrate compliance with the Performance Requirements relating to material and systems for structural safety.

One or more Performance Solutions are used to demonstrate compliance with the Performance Requirements relating to material and systems for fire safety.

Is located in an area prone to natural disaster or adverse environmental conditions.

Class 2 — all or part of the building is Class 2 of three or more storeys.

Occupant numbers — the building is to be occupied by more than 100 people determined in accordance with D2D18.

Occupant characteristics — the building is to be occupied by more than 10 people who will require assistance to evacuate the building in an emergency.

Importance Level — the building is determined to be Importance Level 4 or 5.

Notes

The NCC currently does not include corresponding technical requirements relating to the defined term ‘building complexity criteria’ and the various building complexity levels. It is intended that these terms will be integrated into future editions of the NCC.

Table 2 Building complexity level

Building complexity level

Criteria

Low

The building meets only one of the following building complexity criteria: (a) (Attributes), (b) (Class 2), (c) (Occupant numbers) or (d) (Occupant characteristics)

Medium

The building meets two of the following building complexity criteria: (a) (Attributes), (b) (Class 2), (c) (Occupant numbers) or (d) (Occupant characteristics)

High

The building meets three of the following building complexity criteria: (a) (Attributes), (b) (Class 2), (c) (Occupant numbers) or (d) (Occupant characteristics)

Very high

The building meets all of the following building complexity criteria: (a) (Attributes), (b) (Class 2), (c) (Occupant numbers) and (d) (Occupant characteristics); or (e) (Building Importance Level 4 or 5)

Used in