Performance Requirement · NCC 2025 Volume One

J1P1 Operational energy use and greenhouse gas emissions

Part J1 Energy efficiency performance requirements · NCC 2019: JP1

Open J1P1 on NCC Online ↗
Varied in NSW. Check the variation for your state.

A building, other than a Class 4 part of a building, including its services, must have features that—

facilitate the efficient use of energy and near zero operational greenhouse gas emissions appropriate to—

the function and use of the building; and

the level of human comfort required for the building use; and

for the conditioned space, achieve an hourly regulated energy consumption and associated greenhouse gas emission, averaged over the annual hours of operation, of not more than—

for a Class 6 building, 40 kJ/m².hr and 4 g of CO2-e/m2.hr; and

for a Class 5, 7b, 8 or 9a building other than a ward area, or a Class 9b school, 22 kJ/m².hr and 2.2 g of CO2-e/m2.hr; and

for all other building classifications, 8 kJ/m².hr and 1 g of CO2-e/m2.hr.

Changed since NCC 2022. See NCC 2022 Volume One J1P1, or show what changed.

A building, other than a sole-occupancy unit of a Class 2 building or a Class 4 part of a building, including its services, must have features that — facilitate the efficient use of energy and near zero operational greenhouse gas emissions appropriate to — the function and use of the building; and the level of human comfort required for the building use; and solar radiation being — utilised for heating; and controlled to minimise energy for cooling; and the energy source of the services; and the sealing of the building envelope against air leakage; and for a conditioned space, achieving achieve an hourly regulated energy consumption, consumption and associated greenhouse gas emission, averaged over the annual hours of operation, of not more than — for a Class 6 building, 80 kJ/m².hr; 40 kJ/m².hr and 4 g of CO2-e/m2.hr; and for a Class 5, 7b, 8 or 9a building other than a ward area, or a Class 9b school, 43 kJ/m².hr; 22 kJ/m².hr and 2.2 g of CO2-e/m2.hr; and for all other building classifications, 15 kJ/m².hr. 8 kJ/m².hr and 1 g of CO2-e/m2.hr.

Removed words are struck through; added words are highlighted. Comparison of the text only.

State and territory variations all clauses side by side →

Defined terms used