Performance Requirement · NCC 2025 Volume One

J1P4 Renewable energy, energy storage and electric vehicle charging

Part J1 Energy efficiency performance requirements

Open J1P4 on NCC Online ↗
Varied in NSW. Check the variation for your state.

A building must have features that facilitate the future installation of on-site renewable energy generation and energy storage equipment, except where this is already installed to the maximum practicable extent, and electric vehicle charging equipment.

Changed since NCC 2022. See NCC 2022 Volume One J1P4, or show what changed.

A building must have features that facilitate the future installation of on-site renewable energy generation and energy storage equipment, except where this is already installed to the maximum practicable extent, and electric vehicle charging equipment.

Removed words are struck through; added words are highlighted. Comparison of the text only.

State and territory variations all clauses side by side →

Defined terms used