Specification clause · NCC 2025 Volume One

S19C1 Scope

Specification 19 Fire control centres · NCC 2019: Spec E1.8: 1

Open S19C1 on NCC Online ↗

(1) This Specification describes the construction and content of required fire control centres and rooms.

(2) A fire control room is a fire control centre in a dedicated room with additional specific requirements.

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One S19C1.

Defined terms used