S30C2 Explosion relief
Specification 30 Installation of boilers and pressure vessels · NCC 2019: Spec G2.2: 2.1
The distance between the vent of any explosion relief device for a boiler or pressure vessel and any adjacent wall, roof, ceiling or other solid construction shall be calculated in accordance with Table S30C2.
Table S30C2 Minimum clearances for explosion relief
Clearance from
Minimum clearance (metres)
Adjacent wall or ceiling/roof
[formula] or 0.4 m, whichever is the greater
Two walls at right angles; or one wall and a ceiling/roof
[formula] or 0.6 m, whichever is the greater
Table Notes
For the purposes of this table, [formula] is the internal volume of the boiler or pressure vessel being vented up to the connection of the flue.
Tables
Changed since NCC 2022. See NCC 2022 Volume One S30C2, or show what changed.
The distance between the vent of any explosion relief device … [formula] or 0.6 m, whichever is the greater Table Notes For the purposes of this table, [formula] is the internal volume of the boiler or pressure vessel being vented up to the connection of the flue.
Removed words are struck through; added words are highlighted. Comparison of the text only.