S34C4 Services — proposed and reference building
Specification 34 Modelling parameters for J1V3 · NCC 2019: Spec JVb: 4
For the modelling of services for the purposes of calculating annual greenhouse gas emissions —
system demand and response for all items of plant must be calculated on a not less frequent than hourly basis; and
energy usage of all items of plant must be calculated with allowances for—
part load performance; and
staging to meet system demand; and
energy usage of cooling plant must be calculated with allowances for—
the impact of chilled water temperature on chiller efficiency; and
the impact of condenser water temperature on water-cooled plant efficiency; and
the impact of ambient temperature on air-cooled plant efficiency; and
the energy use of primary pumps serving individual chillers; and
the energy use of auxiliary equipment, including controls and oil heating for chillers; and
thermal losses in the chilled water system; and
the impact of chilled water temperature on thermal losses in the chilled water system; and
energy usage of water heating systems for space heating must be calculated with allowances for—
the impact of water temperature on water heater efficiency; and
the energy use of primary or feedwater pumps serving individual water heaters; and
thermal losses in water heating systems; and
the thermal mass of water heating systems, accounting for thermal losses during periods when the system is not operating; and
energy usage of fan and pump systems must be calculated with allowances for—
the method of capacity regulation; and
the use of either fixed or variable pressure control; and
energy usage of pump systems must be calculated with allowances for the system fixed static pressure head; and
energy usage of auxiliary equipment associated with co-generation and tri-generation systems, including pumps, cooling towers and jacket heaters, must be calculated; and
if energy usage for each is the same in the proposed building and the reference building, omission from the calculation for both the proposed building and reference building may be made for—
heated water supply for food preparation and sanitary purposes; and
lifts; and
escalators; and
electric vehicle charging; and
energy use of a lift in a building with more than one classification may be apportioned according to the number of storeys of the part for which the annual greenhouse gas emissions are being calculated.
Changed since NCC 2022. See NCC 2022 Volume One S34C4, or show what changed.
For the modelling of services for the purposes of calculating … pumps, cooling towers and jacket heaters, must be calculated; and where the if energy usage of the heated water supply for food preparation and sanitary purposes or the energy usage of lifts and escalators each is the same in the proposed building and the reference building, they may be omitted omission from the calculation of for both the proposed building and the reference building; building may be made for — heated water supply for food preparation and sanitary purposes; and lifts; and escalators; and electric vehicle charging; and energy use of a lift in a building with … of the part for which the annual greenhouse gas emissions and thermal comfort level are being calculated.
Removed words are struck through; added words are highlighted. Comparison of the text only.