3.3.5 Stormwater drainage

Part 3.3 Drainage · NCC 2019: 3.1.3.5

Open 3.3.5 on NCC Online ↗

Where a stormwater drainage system is installed, it must comply with the following:

The position and manner of discharge of the stormwater drainage system must be to the satisfaction of the appropriate authority.

The stormwater drainage system must be designed so that any overflow during heavy rain periods is prevented from flowing back into the building.

Cover to stormwater drains: the cover to 90 mm Class 6 UPVC stormwater drains installed underground must be not less than—

under soil — 100 mm; or

under paved or concrete areas — 50 mm; or

under areas subject to light vehicle traffic—

reinforced concrete — 75 mm; or

paved — 100 mm.

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 3.3.5.