Housing Provisions clause · ABCB Housing Provisions 2022

7.3.2 Fixing of roof tiles and ancillaries

Part 7.3 Roof tiles and shingles · NCC 2019: 3.5.2.2

Open 7.3.2 on NCC Online ↗

(1) Roof tiles and hip, ridge, barge and capping tiles must be fixed in accordance with Table 7.3.2 and Figure 7.3.2a, Figure 7.3.2b, Figure 7.3.2c, Figure 7.3.2d and Figure 7.3.2e.

(2) Fixing required by Table 7.3.2 must consist of one or a combination of the following:

Galvanized clout nails with a minimum diameter of 2.8 mm and of a length so that the nail will penetrate not less than 15 mm into the batten.

Self embedding head screws of 8-18 gauge and of a length so that the screw will penetrate not less than 15 mm into the batten.

Purpose made clips of non-ferrous metal, stainless steel or steel protected from corrosion in accordance with Tables 7.2.2b, 7.2.2c and 7.2.2d.

Flexible pointing material complying with AS 2050.

Table 7.3.2 Minimum fixing requirements

Wind class

Tile fixing - edge of roof

Tile fixing - field of roof

Ridge, hip, barge and valley tiles including capping (see Figure 7.3.2d and 7.3.2e)

N1 and N2

Fix every full tile in second course in from the edge of roof.

In field of roof fix every second tile in every course, or every tile in each alternative course. (see Figure 7.3.2b)

Fix each tile

N3

Fix each full tile in every second course starting from the second course in (see Figure 7.3.2c)

Fix every second full tile in every course (see Figure 7.3.2c)

Fix each tile

Table Notes

Refer to Figure 7.3.2a for determination of ‘edge of roof’ and ‘field of roof’.

Figure 7.3.2a Fixing of tile requirements — Identification of field and edge of roof

Figure 7.3.2b Fixing of tile requirements — Minimum tile fixing requirements - Wind class N1/N2

Figure 7.3.2c Fixing of tile requirements — Minimum tile fixing requirements N3

Figure 7.3.2d Fixing of ridge capping — ridge clip fixing

Figure 7.3.2e Fixing of hip capping — clout or screw fixing

Tables

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 7.3.2.

Defined terms used