Housing Provisions clause · ABCB Housing Provisions 2022

7.3.6 Water discharge

Part 7.3 Roof tiles and shingles · NCC 2019: 3.2.5.6

Open 7.3.6 on NCC Online ↗

Where an eaves gutter is provided in accordance with H2D6(1), tiles must overhang the fascia or tiling batten by not less than 35 mm (See Figure 7.3.5).

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 7.3.6.

Clauses referred to