ABCB Housing Provisions 2022
Part 3.2 Earthworks
2 clauses · Open on NCC Online ↗
- Table 3.2.1 Un-retained embankment slope ratiosSoil class (see 4.2.2 for material description) | Site cut (excavation) (maximum embankment slope ratio, angle of site cut H:L Note 1) | Compacted…
- 3.2.1 Un-retained bulk earthworks – site cut and fillA site cut using an un-retained embankment must be— within the allotment; and not within the zone of influence of any existing structure on the…