Table · ABCB Housing Provisions 2022
Table 3.2.1 Un-retained embankment slope ratios
| Soil class (see 4.2.2 for material description) | Site cut (excavation) (maximum embankment slope ratio, angle of site cut H:L Note 1) | Compacted fill (maximum embankment slope ratio, angle of batter H:L Note 1) |
|---|---|---|
| Stable rock (Class A) | 8:1 | 3:3 |
| Sand (Class A) | 1:2 | 1:2 |
| Firm clay (Class M-E) | 1:1 | 1:2 |
| Soft clay (Class M-E) | 2:3 | Not suitable |
Table Notes
See Figures 3.2.1a and 3.2.1b for some examples of un-retained embankment slopes.
Retaining walls must be installed in accordance with H1D3(2) where—
the embankment slope is steeper than described in this Table; or
the soil type is not described in this Table.
Table for 3.2.1 Un-retained bulk earthworks – site cut and fill
Changed in NCC 2025 (minor wording). See ABCB Housing Provisions 2025 Table 3.2.1, or show what changed.
Soil class (see 4.2.2 for material description) | Site cut … H:L Note 1) Stable rock (Class A) | 8:1 | 3:3 2:3 Sand (Class A) | 1:2 | 1:2 Firm clay (Class … or the soil type is not described in this Table.
Removed words are struck through; added words are highlighted. Comparison of the text only.