Table · ABCB Housing Provisions 2022

Table 3.4.2 Acceptable termite management systems and components

Part 3.4 Termite risk management

Open Table 3.4.2 on NCC Online ↗
Building elementTermite management system or component options
Concrete slab-on-ground: slab perimeter or external wall perimeterSlab edge exposure
Concrete slab-on-ground: penetrations/control joints/area beneath the slab (see Note)Sheet material
Suspended floorsSheet material
Attachments to buildingsTermite management system to the attachment

Sheet material

Granular material

Chemical

Granular material

Chemical

Granular material

Chemical

Inspection zone between attachment and building

Table Notes

The entire area beneath the slab must be treated when the slab-on-ground is not designed and constructed in accordance with AS 2870 or AS 3600.

Table for 3.4.2 Termite management systems

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 Table 3.4.2.