Table · ABCB Housing Provisions 2025
Table 3.4.2 Acceptable termite management systems and components
Part 3.4 Termite risk management
| Building element | Termite management system or component options |
|---|---|
| Concrete slab-on-ground: slab perimeter or external wall perimeter | Slab edge exposure |
| Concrete slab-on-ground: penetrations/control joints/area beneath the slab (see Note) | Sheet material |
| Suspended floors | Sheet material |
| Attachments to buildings | Termite management system to the attachment |
Sheet material
Granular material
Chemical
Granular material
Chemical
Granular material
Chemical
Inspection zone between attachment and building
Table Notes
The entire area beneath the slab must be treated when the slab-on-ground is not designed and constructed in accordance with AS 2870 or AS 3600.
Table for 3.4.2 Termite management systems
Same wording in ABCB Housing Provisions 2022. See ABCB Housing Provisions 2022 Table 3.4.2.