Western Australia variation · ABCB Housing Provisions 2022

WA 2.2.3 Determination of individual actions

Part 2.2 Structural provisions · varies 2.2.3 Determination of individual actions

Open on NCC Online ↗

Delete clause 2.2.3 and insert WA 2.2.3 as follows:

The magnitude of individual actions must be determined in accordance with the following:

Permanent actions:

the design or known dimensions of the building or structure; and

the unit weight of the construction; and

AS/NZS 1170.1.

Imposed actions:

the known loads that will be imposed during the occupation or use of the building or structure; and

construction activity actions; and

AS/NZS 1170.1.

Wind, snow and earthquake actions:

the applicable annual probability of design event for safety, determined by—

assigning the building or structure an Importance Level in accordance with Table 2.2.3a; and

determining the corresponding annual probability of exceedance for safety in accordance with WA Table 2.2.3b; and

for wind actions, AS/NZS 1170.2 or AS 4055, except where varied by WA Part 2.3; and

for snow and ice actions, AS/NZS 1170.3; and

for earthquake actions, AS 1170.4.

Actions not covered in (a), (b) and (c) above:

the nature of the action; and

the nature of the building or structure; and

the Importance Level of the building or structure determined in accordance with Table 2.2.3a; and

AS/NZS 1170.1.

For the purposes of (d) the actions include but are not limited to—

liquid pressure action; and

ground water action; and

rainwater action (including ponding action); and

earth pressure action; and

differential movement; and

time dependent effects (including creep and shrinkage); and

thermal effects; and

ground movement caused by—

swelling, shrinkage or freezing of the subsoil; and

landslip or subsidence; and

siteworks associated with the building or structure; and

construction activity actions.

Table 2.2.3a Importance Levels of buildings and structures

Importance Level

Building types

1

Buildings or structures presenting a low degree of hazard to life and other property in the case of failure.

2

Buildings or structures not included in Importance Level 1.

Insert WA table (2.2.3b) 2.2.3 as follows:

WA Table 2.2.3b: Design events for safety – annual probability of exceedance

Importance Level

Non- cyclonic wind

Cyclonic wind other than wind Region D north of the Tropic of Capricorn

Cyclonic wind in wind Region D north of the Tropic of Capricorn

Snow

Earthquake

1

1:100

1:200

1:250

1:100

1:250

2

1:500

1:500

1:1000

1:150

1:500

Figure 2.2.3 Wind regions

Not in NCC 2025. No WA 2.2.3 in ABCB Housing Provisions 2025.

The national clause