C3D13 Separation of equipment

Part C3 Compartmentation and separation · NCC 2019: C2.12

Open C3D13 on NCC Online ↗

(1) Equipment other than that described in (2) and (3) must be separated from the remainder of the building with construction complying with (4), if that equipment comprises—

lift motors and lift control panels; or

emergency generators used to sustain emergency equipment operating in the emergency mode; or

central smoke control plant; or

boilers; or

a battery system installed in the building that has a total voltage of 12 volts or more and a storage capacity of 200 kWh or more.

(2) Equipment need not be separated in accordance with (1) if the equipment comprises—

smoke control exhaust fans located in the air stream which are constructed for high temperature operation in accordance with Specification 21; or

stair pressurising equipment installed in compliance with the relevant provisions of AS 1668.1; or

a lift installation without a machine-room; or

equipment otherwise adequately separated from the remainder of the building.

(3) Separation of on-site fire pumps must comply with the requirements of AS 2419.1.

(4) Separating construction must have—

except as provided by (b)—

an FRL as required by Specification 5, but not less than 120/120/120; and

any doorway protected with a self-closing fire door having an FRL of not less than –/120/30; or

when separating a lift shaft and lift motor room, an FRL not less than 120/–/–.

Changed in NCC 2025 (minor wording). See NCC 2025 Volume One C3D13, or show what changed.

(1) Equipment other than that described in (2) and (3) … for high temperature operation in accordance with Specification 21; or stair exit pressurising equipment installed in compliance with the relevant provisions of … and lift motor room, an FRL not less than 120/–/–.