Performance Requirement · NCC 2022 Volume One

F1P3 Rainwater drainage systems

Part F1 Surface water management, rising damp and external waterproofing · NCC 2019: FP1.3

Open F1P3 on NCC Online ↗

A drainage system for the disposal of surface water resulting from a storm having an annual exceedance probability of—

5% must—

convey surface water to an appropriate outfall; and

avoid surface water damaging the building; and

1% must avoid the entry of surface water into a building.

Not in NCC 2025. No F1P3 in NCC 2025 Volume One.

Defined terms used