Performance Requirement · NCC 2022 Volume One
F1P3 Rainwater drainage systems
Part F1 Surface water management, rising damp and external waterproofing · NCC 2019: FP1.3
A drainage system for the disposal of surface water resulting from a storm having an annual exceedance probability of—
5% must—
convey surface water to an appropriate outfall; and
avoid surface water damaging the building; and
1% must avoid the entry of surface water into a building.
Not in NCC 2025. No F1P3 in NCC 2025 Volume One.