Deemed-to-Satisfy Provision · NCC 2022 Volume One

G1D1 Deemed-to-Satisfy Provisions

Part G1 Minor structures and components · NCC 2019: G1.0

Open G1D1 on NCC Online ↗
Varied in TAS. Check the variation for your state.

(1) Performance RequirementG1P1 must be complied with.

(2) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements G1P2 to G1P5 are satisfied by complying with G1D2 to G1D4.

(3) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.

for G1P1. This is because the solution to compliance with G1P1 will vary considerably from allotment to allotment. This does not alter the fact that compliance must be achieved with G1P1.

Changed in NCC 2025. See NCC 2025 Volume One G1D1, or show what changed.

(1) Performance RequirementG1P1 must be complied with. (2) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements G1P2 G1P1 to G1P5 are satisfied by complying with G1D2 to G1D4. (3) G1D5. (2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable. for G1P1. This is because the solution to compliance with G1P1 will vary considerably from allotment to allotment. This does not alter the fact that compliance must be achieved with G1P1.