G1D1 Deemed-to-Satisfy Provisions
Part G1 Minor structures and components · NCC 2019: G1.0
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements G1P1 to G1P5 are satisfied by complying with G1D2 to G1D5.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Changed since NCC 2022. See NCC 2022 Volume One G1D1, or show what changed.
(1) Performance RequirementG1P1 must be complied with. (2) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements G1P2 G1P1 to G1P5 are satisfied by complying with G1D2 to G1D4. (3) G1D5. (2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable. for G1P1. This is because the solution to compliance with G1P1 will vary considerably from allotment to allotment. This does not alter the fact that compliance must be achieved with G1P1.
Removed words are struck through; added words are highlighted. Comparison of the text only.
State and territory variations all clauses side by side →
- NSW Replaced Delete subclause G1D1(1) and insert NSW G1D1(1) as follows: (1) Where a Deemed-to-Satisfy Solution is proposed, Performance…
- SA Replaced Delete subclause G1D1(1) and insert SA G1D1(1) as follows: (1) Where a Deemed-to-Satisfy Solution is proposed, Performance…
- TAS Replaced Delete subclause G1D1(1) and insert TAS G1D1(1) as follows: (2) Where a Deemed-to-Satisfy Solution is proposed, Performance…
Clauses referred to
- G1P1 Swimming pool drainage
- G1P5 Outdoor play spaces in early childhood centres
- G1D2 Swimming pools
- G1D5 Swimming pool drainage
- A2G2 Performance Solution
- A2G4 A combination of solutions