Specification clause · NCC 2022 Volume One
S32C3 Proscenium wall construction
Specification 32 Construction of proscenium walls · NCC 2019: Spec H1.3: 3
A proscenium wall must—
extend to the underside of the roof covering or the underside of the structural floor next above; and
have an FRL of not less than 60/60/60, and if of lightweight construction, comply with Specification 6.
Same wording in NCC 2025 Volume One. See NCC 2025 Volume One S32C3.