S34C3 Proposed building and reference building
Specification 34 Modelling parameters for J1V3 · NCC 2019: Spec JVb: 3
(1) The annual greenhouse gas emissions must be calculated for the proposed building and the reference building using the same—
annual greenhouse gas emissions calculation method; and
greenhouse gas emissions factors in accordance with (2); and
location in accordance with (3); and
adjacent structures and features; and
orientation; and
building form in accordance with (4); and
testing standards including for insulation, glazing, water heater and unitary air-conditioning equipment; and
fabric and glazing in accordance with (5); and
services in accordance with (6) and S34C4.
(2) For the purposes of (1)(b), greenhouse gas emissions factors must be based on either—
the factors in Table S34C3; or
the current full fuel cycle emissions factors published by the Australian Government, except, where the greenhouse gas intensity of electricity is less than half the greenhouse gas intensity of natural gas—
electricity is to be weighted as 1; and
natural gas is to be weighted as 2.
(3) For the purposes of (1)(c), location must be either—
location where the building is to be constructed if appropriate climatic data is available; or
the nearest location with similar climatic conditions, for which climatic data is available.
(4) For the purposes of (1)(f), building form must include—
the roof geometry; and
the floor plan; and
the number of storeys; and
the location, extent and configuration of ground floors and basements; and
the size and location of glazing; and
external doors.
(5) For the purposes of (1)(h), fabric and glazing must include—
quality of insulation installation; and
thermal resistance of air films including any adjustment factors, moisture content of materials and the like; and
dimensions of external, internal and separating walls; and
internal shading devices, their colour and their criteria for operation.
(6) For the purposes of (1)(i), services must include—
range and type of services and energy sources, other than renewable energy generated on site; and
assumptions and means of calculating the temperature difference across air-conditioning zone boundaries; and
floor coverings and furniture and fittings density; and
internal artificial lighting illumination levels; and
internal heat gains including people, lighting, appliances, meals and other electric power loads; and
air-conditioning, including chiller, fan and boiler equipment, system configuration and zones; and
profiles for occupancy, air-conditioning, lighting and internal heat gains from people, hot meals, appliances, equipment and heated water supply systems based on—
Specification 35; or
NABERS Energy simulation requirements; or
Green Star simulation requirements; or
the actual building if—
the operating hours per year are not less than 2 500; or
the daily operating profiles are not listed in Specification 35; and
supply heated water temperature and rate of use; and
infiltration values, subject to (7); and
sequencing for water heaters, refrigeration chillers and heat rejection equipment such as cooling towers; and
representation of clothing and metabolic rate of the occupants; and
control of air-conditioning except—
the reference building must have variable temperature control for chilled and heated water that modulates the chilled water and heated water temperatures as required to maximise the efficiency of the chiller or boiler operation during periods of low load; and
if the controls for the proposed building are not adequately specified or cannot be simulated, the sample control specifications in Appendix B of AIRAH-DA28 must be used; and
environmental conditions such as ground reflectivity, sky and ground form factors, temperature of external bounding surfaces, air velocities across external surfaces and the like; and
number, sizes, floors and traffic served by lifts and escalators.
(7) For the purposes of (6)(i), the intended building leakage at 50 Pa may be converted into a whole building infiltration value for the proposed building infiltration using Tables 4.16 to 4.24 of CIBSE Guide A if all of the following have been specified:
Additional sealing provisions to those required by Part J5.
An intended building leakage of less than 10 m3/hr.m2 at 50 Pa.
Pressure testing to verify achievement of the intended building leakage.
Table S34C3 Greenhouse gas emissions factors (kgCO2-e/GJ)
Energy Source
ACT
NSW
NT
QLD
SA
TAS
VIC
WA
Electricity
-
236
162
254
101
44
279
191
Gas
-
51.53
51.53
51.53
51.53
51.53
51.53
51.53
Table Notes
National emissions factors are not applicable to calculations for buildings in the ACT as they do not take into account investments in renewable electricity generation in the national electricity market made by the ACT.
Values for the ACT can be found in the ACT Appendix.
Tables
Changed in NCC 2025. See NCC 2025 Volume One S34C3, or show what changed.
(1) The annual greenhouse gas emissions must be calculated for … accordance with (2); and location in accordance with (3); and climatic data, using a projection at year 2050 made under a Representative Concentration Pathway with an 8.5 W/m² increase in radiative forcing; and adjacent structures and features; and orientation; and building form in … accordance with (5); and services in accordance with (6) and S34C4. S34C4; and target for thermal comfort minimums as per J1V3(1)(b). (2) For the purposes of (1)(b), greenhouse gas emissions factors must be based on either — the factors in Table S34C3; or the current full fuel cycle emissions factors published by the Australian Government, except, where the greenhouse gas intensity of electricity is less than half the greenhouse gas intensity of natural gas — electricity is to be weighted as 1; and natural gas is to be weighted as 2. S34C3. (3) For the purposes of (1)(c), location must be either — the location where the building is to be constructed if appropriate … which climatic data is available. (4) For the purposes of (1)(f), (1)(g), building form must include the same — the roof geometry; and the floor plan; and the number of storeys; and the location, extent and configuration of ground floors and basements; and the size and location of glazing; and external doors. (5) For the purposes of (1)(h), (1)(i), fabric and glazing must include the same — quality of insulation installation; and thermal resistance of air films including any adjustment factors, moisture … of external, internal and separating walls; and internal shading devices, including their colour and their criteria for operation. operation; and location and extent of thermal mass. (6) For the purposes of (1)(i), (1)(j), services must include the same — range and type of services and energy sources, other sources including the same proportions and functions of air-cooled and water-cooled air-conditioning equipment; and air-conditioning zones including — separate zones for each storey; and separate zones for each sole-occupancy unit; and in spaces larger than renewable energy generated on site; 20 m², separate perimeter zones, no deeper than 4 m adjacent to external walls with windows facing — within 45° of true north; and assumptions within 45° of true south; and means within 45° of true east; and within 45° of true west; and separate centre zones comprising the remainder of each sole-occupancy unit within each storey; and the same method of calculating the temperature difference across air-conditioning zone boundaries; and the same method of combining zones with similar heating and cooling requirements, where necessary to simplify the simulation; and floor coverings and furniture and fittings density; and internal … loads; and air-conditioning, including chiller, fan and boiler equipment, system configuration and zones; configuration; and profiles for occupancy, air-conditioning, lighting and internal heat gains … — the operating hours per year are not less than 2 500; 2,500; or the daily operating profiles are not listed in Specification … chillers and heat rejection equipment such as cooling towers; and where J1V3(1)(b)(i) applies, representation of clothing and metabolic rate of the occupants; occupants, and air speed from mechanical services; and control of air-conditioning air-conditioning, in accordance with the requirements of Part J6, except — the reference building must have variable temperature control for chilled and heated water that modulates the chilled water and heated water temperatures as required to maximise the efficiency of the chiller or boiler operation during periods of low load; and if the controls for the proposed building are not adequately … must be used; and environmental conditions such as ground reflectivity, sky form factors for topography and ground form factors, built environment, temperature of external bounding surfaces, air velocities across external surfaces surfaces, vegetation and the like; and number, sizes, floors and traffic served by lifts and escalators. escalators; and loss factors for solar PV installation. (7) For the purposes of (6)(i), the intended building leakage … Pressure testing to verify achievement of the intended building leakage. (8) Where J1V3(1)(b)(iii), (iv) or (v) applies, the air-conditioning must — subject to (b), for 95% of the annual hours of operation, achieve dry bulb temperatures between — 18°C to 25°C for conditioned spaces with transitory occupancy; and 21°C to 24°C in all other conditioned spaces; and if the proposed building has no mechanically provided cooling or has mixed mode cooling, the proposed building and reference building must have the same method of control and control set points for non-mechanical cooling. Table S34C3 Greenhouse gas emissions factors (kgCO2-e/GJ) Energy Source ACT NSW NT QLD SA TAS VIC WA Electricity - 236 162 254 101 44 279 191 51 110 120 22.5 9 135 83 Gas - 51.53 51.53 51.53 51.53 51.53 51.53 51.53 Table … for the ACT can be found in the ACT Appendix.
Removed words are struck through; added words are highlighted. Comparison of the text only.