Performance Requirement · NCC 2022 Volume Three
C2P1 Disposal
Part C2 Sanitary drainage systems · NCC 2019: CP2.1
A sanitary drainage system must ensure sewage is transferred from a sanitary plumbing system to an approved disposal system.
Changed in NCC 2025. See NCC 2025 Volume Three C2P1, or show what changed.
A Sewage must be conveyed through a sanitary drainage system must ensure sewage is transferred from a sanitary plumbing system to an approved disposal system. system authorised by an authority having jurisdiction.
Removed words are struck through; added words are highlighted. Comparison of the text only.