Deemed-to-Satisfy Provision · NCC 2022 Volume Three
D1D1 Deemed-to-Satisfy Provisions
Part D1 Excessive noise · NCC 2019: D1.1
Varied in NT. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement—
D1P1 is satisfied by complying with D1D2; and
D1P2 is satisfied by complying with D1D3.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Same wording in NCC 2025 Volume Three. See NCC 2025 Volume Three D1D1.
State and territory variations all clauses side by side →
Clauses referred to
- D1P1 Undue noise
- D1D2 Undue noise
- D1P2 Excessive noise
- D1D3 Sound insulation
- A2G2 Performance Solution
- A2G4 A combination of solutions