(1) A roof drainage system must ensure that—

stormwater is transferred to a Network Utility Operator's stormwater system or an approved disposal system; and

appropriate access is provided for maintenance and clearing blockages.

(2) A roof drainage installation must avoid blockage and uncontrolled discharge causing—

loss of amenity; and

loss to building and property.

(3) A roof drainage installation must avoid foul air and gasses accumulating in the roof drainage system.