- TAS A1G4 InterpretationInsert TAS subclause A1G4(7) in clause A1G4 as follows: (7) The Director of Building Control may issue written advice to deal with arising issues…
- TAS A5G4 Evidence of suitability ─ Volume Three (PCA)Insert TAS subclause A5G4(7) in clause A5G4 as follows: (7) A product used in roof plumbing, heating ventilation and air-conditioning or on-site…
- TAS B1D3 General requirementsDelete clause B1D3 and insert TAS B1D3 as follows: (1) The design, construction, installation, repair, alteration, additions, maintenance and…
- TAS B1D7 Cold water storage tanksInsert TAS clause B1D7 in clause B1D7 as follows: (1) B1D7 applies to tanks — including rainwater tanks — connected to the roof plumbing system, or…
- TAS B1P5 PressureDelete clause B1P5 and insert TAS B1P5 as follows: The points of discharge for a cold water service must— have— a working pressure of not less than…
- TAS B2D2 Water heater in a heated water supply systemDelete clause B2D2 and insert TAS B2D2 as follows: In a new Class 1 or Class 10 building— a water heater in a heated water supply system must be— a…
- TAS B2D6 Temperature control devicesDelete clause B2D6 and insert TAS B2D6 as follows: (1) A temperature control device used to deliver heated water in accordance with B2D5(a) must be…
- TAS B2P9 PressureDelete clause B2P9 and insert TAS B2P9 as follows: The points of discharge for a heated water service must— have— a working pressure of not less…
- TAS B7D2 Collection of rainwaterDelete clause B7D2 and insert TAS B7D2 as follows: (1) Rainwater storage must only collect roof water. (2) A rainwater storage system for Class 1…
- TAS C2D4 General requirementsInsert TAS subclause C2D4(2) in clause C2D4 as follows: (2) For Tasmanian venting requirements see TAS C2D6.
- TAS C2D6 Venting requirementsA sanitary drainage system must provide ventilation in accordance with AS/NZS 3500.2. (2) A sanitary drainage system which connects to an on-site…
- TAS C3D6 Land application systemsDelete clause C3D6 and insert TAS C3D6 as follows: (1) An On-site wastewater management system and associated land application system must avoid the…
- TAS C3P5 General requirementsDelete clause C3P5 and insert TAS C3P5 as follows: On-site wastewater management systems that facilitate on-site storage, treatment, disposal or…
- TAS C4D1 ApplicationPerformance Requirements C4P1 to C4P3 are satisfied by complying with C4D2 to C4D19.
- TAS C4D2 General requirementsWhere pre-treatment facilities are installed, they must comply with the requirements of— the Network Utility Operator (where applicable); and…
- TAS C4D3 LocationLow-risk trade waste appliances must be located as close as practicable to the fixtures served, whether installed internally or externally and may…
- TAS C4D4 CoversTrade waste appliances must be fitted with covers which can withstand vehicular or pedestrian traffic or other loads likely to be imposed on them…
- TAS C4D5 MaterialsTrade waste appliances must be constructed from materials suitable for the characteristics of the liquid wastes likely to be discharged.
- TAS C4D6 VentilationWhere airtight covers are fitted, trade waste appliances must be vented with a minimum DN 50 vent. (2) Outlet ventilation is to be provided by…
- TAS C4D7 ConnectionsThe plumbing and drainage installation upstream of a low-risk trade waste appliance must comply with AS/NZS 3500.2 (2) The sanitary plumbing and…
- TAS C4D8 Silt pitsThe silt pit must be connected and authorised by the Permit Authority. (2) The silt pit bucket must— be constructed of mild steel plate, minimum 3…
- TAS C4D9 Silt trapsThe silt trap must be connected and authorised by the Permit Authority. (2) The silt trap bucket must— be constructed of mild steel plate, minimum 3…
- TAS C4D10 Straining pitsThe straining pit must be connected and authorised by the Permit Authority. (2) The straining pit basket must— be constructed of mild steel wire…
- TAS C4D11 Straining trapsThe straining trap must be connected and authorised by the Permit Authority. (2) The straining pit basket must— be constructed of mild steel wire…
- TAS C4D12 Grease interceptorsA grease interceptor must contain a permanently fixed, ridged baffle constructed of a minimum 6 mm— mild steel plate; or other authorised material.…
- TAS C4D13 Portable grease interceptor appliancesThe capacity of a portable grease interceptor must be authorised by the Permit Authority. (2) A portable grease interceptor must contain a…
- TAS C4D14 Venting of grease trapsGrease trap chambers must provide adequate ventilation by providing— two DN 100 vents in addition to the ventilation provided for the sanitary…
- TAS C4D15 Grease trap installation in multi-storey buildingsGrease traps in multi-storey buildings must have a reflux valve installed between the outlet and connection to the sanitary plumbing system.
- TAS C4D16 Oil and petrol interceptorsThe capacity of an oil and petrol interceptor must be authorised by the Permit Authority. (2) An oil and petrol interceptor must contain a…
- TAS C4D17 Acid neutralising tanksThe capacity of an acid neutralising tank must be authorised by the Permit Authority. (2) An acid neutralising tank and fixed baffles must be…
- TAS C4D18 Mixing tanksThe capacity of a mixing tank must be authorised by the Permit Authority. (2) A mixing tank and baffles must be constructed of a minimum— 6 mm PVC-U…
- TAS C4D19 Settling tanksThe capacity of a settling tank must be authorised by the Permit Authority. (2) The settling tank and baffles are to be constructed of a minimum— 6…
- TAS C4P1 Health, environment and amenity protectionAn on-site liquid trade waste system must ensure— the risks associated with the discharge of treated liquid trade waste to the environment are…
- TAS C4P2 Transferal of liquid trade wasteLiquid trade waste must be transferred within the disposal system and treatment devices in a way that avoids— blockage and uncontrolled discharge:…
- TAS C4P3 Design, construction and installationA trade waste treatment device must— have appropriate treatment and storage capacity for the volume of waste and frequency of disposal: and be of…
- TAS E2D1 ApplicationPerformance Requirement E2P1 to E2P3 are satisfied by complying with E2D2.
- TAS E2D2 General requirementsMechanical ventilation and air-conditioning systems for must comply with the requirements of the relevant Parts of: NCC Volume One for Class 2 to 9…
- TAS E2F1 Functional statement 1Mechanical services, plant and equipment used for heating, cooling and/or ventilation of a building must be adequate for their intended purpose.
- TAS E2F2 Functional statement 2A heating, cooling and/or ventilation system must support energy efficient outcomes and minimise any impact on building occupants of adjoining…
- TAS E2O1 ObjectiveThe Objective of this Part is to— safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a heating,…
- TAS E2P1 Design, construction, installation and maintenanceA mechanical service, plant and equipment for heating, cooling and/or ventilation must avoid the following: Damage to property. Loss of amenity to…
- TAS E2P2 Pressure equipmentPressure equipment used in mechanical heating, cooling and ventilation systems must avoid the likelihood of explosion, rupture or leakage.
- TAS E2P3 Microbial controlMechanical air-handling and cooling water systems installed in a building must control the accumulation of microbial growth.
- TAS E3D1 ApplicationPerformance Requirements E3P1 to E3P4 are satisfied by complying with E3D2 and E3D3.
- TAS E3D2 General requirementsA roof drainage system must comply with— AS/NZS 3500.3; or Housing Provisions 7.4
- TAS E3D3 Roofing of liquid trade waste generation areasWhen a liquid trade waste generating process does not fully occur within a building, suitable roofing must prevent the entry of stormwater to the…
- TAS E3F1 Functional statementsBuildings are to be provided with roof drainage to provide protection to people, property and the environment from adverse effects of stormwater.
- TAS E3O1 ObjectiveThe objective of this part is to— safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a roof drainage…
- TAS E3P1 Roof drainage systemsA roof drainage system must have the capacity to transfer the volume of water anticipated in a 5% annual exceedance probability rainfall event. (2)…
- TAS E3P2 OverflowA roof drainage system must provide an overflow device suitable for a 1% annual exceedance probability rainfall event.
- TAS E3P3 WatertightnessAll internal roof drainage components must be watertight.
- TAS E3P4 Design, construction and installationA roof drainage system must ensure that— stormwater is transferred to a Network Utility Operator's stormwater system or an approved disposal system;…
- TAS E4D1 ApplicationPerformance requirements E4P1 to E4P3 are satisfied by complying with E4D2 and E4D3.
- TAS E4D2 General requirementsA surface and subsurface drainage system must comply with— AS/NZS 3500.3; or Housing provisions 3.3
- TAS E4D3 Protection from surface waterSurface water must be prevented from escaping a liquid trade waste generating area though the installation of a bund, speed hump or other feature a…
- TAS E4F1 Functional statementsBuildings and their surroundings are to be provided with a surface drainage and subsurface drainage installation and be constructed in such a manner…
- TAS E4O1 ObjectiveThe Objective of this Part is to— safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a stormwater…
- TAS E4P1 Surface drainage systemsA surface drainage system must have capacity to transfer the volume of water anticipated in an annual exceedance probability rainfall event. (2) The…
- TAS E4P2 Subsurface drainageA subsoil drainage system must remove excess groundwater and reduce soil moisture levels to prevent loss by changing soil moisture conditions.
- TAS E4P3 Design, construction and installationA surface drainage installation must avoid the following: Blockage and uncontrolled discharge. Damage from root penetration, superimposed loads or…