VIC E3O1 Objective
VIC Part E3 Stormwater - Roof drainage systems
The Objective of this Part is to—
safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a roof drainage installation; and
ensure that a roof drainage installation is adequate; and
conserve water and energy; and
safeguard the environment; and
safeguard public and private infrastructure; and
ensure that a roof drainage installation is designed and is capable of being maintained so that throughout its serviceable life it will continue to satisfy Objectives (a) to (e).
Changed in NCC 2025. See NCC 2025 Volume Three VIC E3O1, or show what changed.
Delete clause E3O1 and insert VIC E3O1 as follows: The Objective of this Part is to — safeguard people … life it will continue to satisfy Objectives (a) to (e).
Removed words are struck through; added words are highlighted. Comparison of the text only.