NCC 2022 Volume Three
Victoria variations
58 VIC variations to NCC 2022 Volume Three: clauses replaced, added or deleted in Victoria. Search with VIC variations.
- VIC A2G2 Performance SolutionInsert VIC subclause A2G2(5) in clause A2G2 as follows: (5) A Performance Solution cannot be used to satisfy a relevant Performance Requirement for…
- VIC B1D3 General requirementsDelete clause B1D3 and insert VIC B1D3 as follows: (1) A cold water service must be in accordance with AS/NZS 3500.1. (2) Drinking water that is not…
- VIC B2D2 Water heater in a heated water supply systemInsert VIC subclause B2D2(5) in clause B2D2 as follows: (5) A solar water heater system installed in a new Class 1 building to comply with Part 2.6…
- VIC B2D5 Maximum delivery temperatureDelete clause B2D5 and insert VIC B2D5 as follows: The delivery temperature of heated water at the outlet of each sanitary fixture must be— not more…
- VIC B2D6 Temperature control devicesDelete clause B2D6 and insert VIC B2D6 as follows: (1) A temperature control device used to deliver heated water in accordance with B2D5(a) must be…
- VIC B2P3 VelocityDelete subclause B2P3(1) and insert VIC B2P3(1) as follows: The water velocity in heated water service pipework up to 65 °C must not exceed— 3 m/s…
- VIC B2P4 Access and isolationDelete subclause B2P4(1) and insert VIC B2P4(1) as follows: (1) Access must be available to the heated water service for maintenance of mechanical…
- VIC B2P7 Energy use and sourceInsert VIC subclause B2P7(3) in clause B2P7 as follows: (3) A solar water heater system installed in a new Class 1 building to comply with Part 2.6…
- VIC B3D3 General requirementsDelete clause B3D3 and insert VIC B3D3 as follows: A non-drinking water service must be in accordance with AS/NZS 3500.1, subject to the following:…
- VIC B3P3 VelocityDelete subclause B3P3(1) and insert VIC B3P3(1) as follows: Non-drinking water services must ensure that pipework water velocity does not exceed 3…
- VIC B4D2 General requirementsDelete clause B4D2 and insert VIC B4D2 as follows: (1) Fire-fighting water services for Class 2 to Class 9 buildings and structures must comply with…
- VIC B4P2 Access and isolationDelete subclause B4P2(2) and insert VIC B4P2(2) as follows: (2) A fire-fighting water service must ensure the system can be isolated for testing and…
- VIC B6D1 Deemed-to-Satisfy ProvisionsDelete subclause B6D1(1) and insert VIC B6D1(1) as follows: (1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B6P1 to…
- VIC B6D2 General requirementsDelete clause B6D2 and insert VIC B6D2 as follows: A rainwater service must comply with Section 15 of AS/NZS 3500.1. Notes The Victorian NCC 2019…
- VIC B6P7 Rainwater serviceInsert VIC clause B6P7 in clause B6P7 as follows: A rainwater service must— avoid the likelihood of contamination of water within the rainwater…
- VIC B7D1 Deemed-to-Satisfy ProvisionsDelete subclause B7D1(1) and insert VIC B7D1(1) as follows: (1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B7P1 to…
- VIC B7D3 IdentificationDelete clause B7D3 and insert VIC B7D3 as follows: The rainwater storage must be identified as rainwater in accordance with AS/NZS 3500.1.
- VIC B7D4 General requirementsInsert VIC clause B7D4 in clause B7D4 as follows: Rainwater storage must— comply with AS/NZS 3500.1; and not have an unprotected cross-connection…
- VIC B7P1 Contamination controlDelete subclause B7P1(1) and insert VIC B7P1(1) as follows: (1) Rainwater storage must reduce the likelihood of contamination within the rainwater…
- VIC B7P4 IdentificationDelete clause B7P4 and insert VIC B7P4 as follows: Rainwater storage and holding tanks used only for non-drinking purposes must be clearly identified.
- VIC C1D3 General requirementsDelete clause C1D3 and insert VIC C1D3 as follows: A sanitary plumbing system must be in accordance with AS/NZS 3500.2 subject to the following: For…
- VIC C2D4 General requirementsDelete clause C2D4 and insert VIC C2D4 as follows: (1) A sanitary drainage system must be in accordance with AS/NZS 3500.2; subject to the…
- VIC C2P8 No point of connectionInsert VIC clause C2P8 in clause C2P8 as follows: Where a point of connection to a Network Utility Operator's sewerage system is not available, an…
- VIC C2V2 Pressure testingThis clause been deliberately left blank
- VIC C3P1 Health impactsDelete subclause C3P1(1) and insert VIC C3P1(1) as follows: On-site wastewater management systems must protect public health by ensuring that— risks…
- VIC C3P5 General requirementsDelete clause C3P5 and insert VIC C3P5 as follows: On-site wastewater management systems that facilitate on-site storage, treatment, disposal or…
- VIC C3P6 Land application systemsDelete clause C3P6 and insert VIC C3P6 as follows: (1) On-site wastewater management systems and associated land application systems must— complete…
- VIC C3P7 Access for maintenanceDelete clause C3P7 and insert VIC C3P7 as follows: (1) On-site wastewater management systems that facilitate on-site storage, treatment, disposal or…
- VIC C4F1 Functional statementWhere liquid trade waste is generated, adequate space and facilities must be provided for the safe and hygienic collection, holding, treatment…
- VIC C4O1 ObjectiveThe Objective of this part is to— safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a low risk on-site…
- VIC C4P1 Requirements for low risk on-site liquid trade waste management practicesA low risk liquid trade waste appliance must— be located as close as practicable to the fixtures that it serves and if of the portable type must be…
- VIC D1D2 Undue noiseDelete subclause D1D2(1) and insert VIC D1D2(1) as follows: To prevent undue noise, plumbing and drainage systems must comply with— B1D3 for cold…
- VIC D1F1 Excessive noiseDelete subclause D1F1(1) and insert VIC D1F1(1) as follows: A plumbing and drainage system must be designed and installed so as to operate in a way…
- VIC E2D1 ApplicationPerformance requirements E2P1 to E2P3 are satisfied by complying with E2D2.
- VIC E2D2 General requirementsMechanical ventilation and air-conditioning systems for buildings and structures must comply with the requirements of the relevant Parts of: NCC…
- VIC E2F1 Functional statement 1Mechanical services, plant and equipment used for heating, cooling and/or ventilation of a building must be adequate.
- VIC E2F2 Functional statement 2A building’s heating, cooling and/or ventilation system installation and maintenance must support energy efficient outcomes and minimise any adverse…
- VIC E2O1 ObjectiveThe Objective of this Part is to— safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a heating,…
- VIC E2P1 Design, construction, installation and maintenanceMechanical services, or plant and equipment for heating, cooling and/or ventilation must avoid the following: Damage to property. Loss of amenity to…
- VIC E2P2 Pressure equipmentPressure equipment used in mechanical heating, cooling or ventilation systems must avoid the likelihood of explosion, rupture or leakage.
- VIC E2P3 Microbial controlMechanical air-handling and cooling water systems installed in a building must control the accumulation of harmful microbial growth.
- VIC E3D1 ApplicationPerformance Requirements E3P1 to E3P4 are satisfied by complying with E3D2.
- VIC E3D2 General requirementsThe design, construction, installation, replacement, repair, alteration and maintenance of a roof drainage system must be in accordance with AS/NZS…
- VIC E3F1 Functional statementBuildings are to be provided with a roof drainage installation constructed to provide protection for people, property and the environment from the…
- VIC E3O1 ObjectiveThe Objective of this Part is to— safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a roof drainage…
- VIC E3P1 Roof drainage systemsA roof drainage system must dispose of stormwater flows from rainfall events having an average recurrence interval appropriate to: The importance of…
- VIC E3P2 OverflowA roof drainage system must provide an overflow device to transfer stormwater flows generated by extreme rainfall events.
- VIC E3P3 WatertightnessAll internal roof drainage components must be watertight.
- VIC E3P4 Design, construction and installationA roof drainage system must ensure the following— Stormwater is transferred to a point of connection. Access for maintenance and clearing blockages.…
- VIC E4D1 ApplicationPerformance Requirements E4P1 to E4P2 are satisfied by complying with E4D2.
- VIC E4D2 General requirementsThe design, construction, installation, replacement, repair, alteration and maintenance of surface and subsurface drainage systems must be in…
- VIC E4F1 Functional statementBuildings and their surroundings are to be provided with a surface drainage and subsurface drainage installation and be constructed in such a manner…
- VIC E4O1 ObjectiveThe Objective of this Part is to— safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a drainage…
- VIC E4P1 Surface drainage systemsA surface drainage system must dispose of stormwater flows from rainfall events having an average recurrence interval appropriate to: The importance…
- VIC E4P2 Design, construction and installationA surface drainage installation must avoid the following: Blockage and uncontrolled discharge. Damage from root penetration, superimposed loads or…
- VIC S41C3 Protection types and hazard ratingsDelete subclause S41C3(3) and insert VIC S41C3(3) as follows: (3) Pipework and outlets supplied by a drinking water source downstream of an…
- VIC S41C4 Individual protectionDelete subclause S41C4(3) and insert VIC S41C4(3) as follows: (3) The following are High Hazard for the purpose of individual protection:…
- VIC S41C6 Containment protectionDelete clause S41C6 and insert VIC S41C6 as follows: (1) The following are Low Hazard for the purpose of containment protection: A water service…