Governing requirement · NCC 2022 Volume Two
A5G1 Suitability
Part A5 Documentation of design and construction · NCC 2019: A5.0
(1) A building and plumbing or drainage installation must be constructed using materials, products, plumbing products, forms of construction and designs fit for their intended purpose to achieve the relevant requirements of the NCC.
(2) For the purposes of (1), a material, product, plumbing product, form of construction or design is fit for purpose if it is—
supported by evidence of suitability in accordance with—
A5G2; and
A5G3 or A5G4 as appropriate; and
constructed or installed in an appropriate manner.
Same wording in NCC 2025 Volume Two. See NCC 2025 Volume Two A5G1.
Clauses referred to
- A5G2 Evidence of suitability ─ Volumes One, Two and Three
- A5G3 Evidence of suitability ─ Volumes One and Two (BCA)
- A5G4 Evidence of suitability ─ Volume Three (PCA)