H2D2 Drainage
Part H2 Damp and weatherproofing · NCC 2019: 3.1.3.0, 3.1.3.1
Performance RequirementH2P1 is satisfied for drainage if it is designed and constructed in accordance with —
AS/NZS 3500.3; or
provided the stormwater drainage system otherwise complies with (a), Part 3.3 of the ABCB Housing Provisions for drainage of—
roofs in areas subject to 5 minute duration rainfall intensities of not more than 255 mm per hour over an annual exceedance probability of 5% (as per Table 7.4.3d of the ABCB Housing Provisions) where a drainage system is required; and
sub-soil areas where excessive soil moisture problems may occur; and
land adjoining and under buildings.
Changed in NCC 2025. See NCC 2025 Volume Two H2D2, or show what changed.
(1) Performance RequirementH2P1 Requirement H2P1 is satisfied for drainage if it is designed and constructed … moisture problems may occur; and land adjoining and under buildings. (2) Performance Requirement H2P4 is satisfied for swimming pool drainage if the swimming pool's pumped discharge is discharged to the sanitary drainage system in accordance with AS/NZS 3500.2.
Removed words are struck through; added words are highlighted. Comparison of the text only.