H2D1 Deemed-to-Satisfy Provisions
Part H2 Damp and weatherproofing
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements H2P1 to H2P3 are satisfied by complying with H2D2 to H2D8.
(2) Performance RequirementH2P4 must be complied with.
(3) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Notes
There are no Deemed-to-Satisfy Provisions for H2P4.
Changed in NCC 2025. See NCC 2025 Volume Two H2D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements H2P1 to H2P3 H2P4 are satisfied by complying with H2D2 to H2D8. (2) Performance RequirementH2P4 must be complied with. (3) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable. Notes There are no Deemed-to-Satisfy Provisions for H2P4.
Removed words are struck through; added words are highlighted. Comparison of the text only.
Clauses referred to
- H2P1 Rainwater management
- H2P3 Rising damp
- H2D2 Drainage
- H2D8 External waterproofing
- A2G2 Performance Solution
- A2G4 A combination of solutions
- H2P4 Drainage from swimming pools