Specification clause · NCC 2022 Volume Two

S42C4 Additional Deemed-to-Satisfy Provisions when using house energy rating software

Specification 42 House energy rating software

Open S42C4 on NCC Online ↗

(1) To comply with H6P1, in addition to S42C2, a building must comply with Section 13 of the ABCB Housing Provisions clauses—

13.2.2, for building fabric thermal insulation; and

13.2.3(7) and 13.2.5(5), for thermal breaks; and

13.2.3(5), for compensating for a loss of ceiling insulation, other than where the house energy rating software has compensated for a loss of ceiling insulation; and

13.2.6(4), 13.2.6(5) and 13.2.6(6) for floor edge insulation; and

Part 13.4, for building sealing.

(2) To comply with H6P2, in addition to S42C3, a building must comply with Part 13.7 of the ABCB Housing Provisions.

Changed in NCC 2025 (minor wording). See NCC 2025 Volume Two S42C4, or show what changed.

(1) To comply with H6P1, in addition to S42C2, a … has compensated for a loss of ceiling insulation; and 13.2.6(4), 13.2.6(5) 13.2.6(5)(a)(i), 13.2.6(5)(b)(i) and 13.2.6(6) for floor slab edge insulation; and Part 13.4, for building sealing. (2) To … must comply with Part 13.7 of the ABCB Housing Provisions.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Clauses referred to

Defined terms used