WA H9D1 Deemed-to-Satisfy Provisions
WA Part H9 Water use
(1) Performance RequirementWA H9P1 is satisfied for a building’s water use efficiency by complying with WA H9D2.
(2) Performance RequirementWA H9P2 is satisfied for a building’s water loss prevention by complying with WA H9D3.
(3) Performance RequirementWA H9P3 is satisfied for a building’s heated water use efficiency by complying with WA H9D4.
Changed in NCC 2025. See NCC 2025 Volume Two WA H9D1, or show what changed.
Delete clause H9D1 and insert WA H9D1 as follows: (1) Performance RequirementWA Requirement WA H9P1 is satisfied for a building’s water use efficiency by complying with WA H9D2. (2) Performance RequirementWA Requirement WA H9P2 is satisfied for a building’s water loss prevention by complying with WA H9D3. (3) Performance RequirementWA Requirement WA H9P3 is satisfied for a building’s heated water use efficiency by complying with WA H9D4.
Removed words are struck through; added words are highlighted. Comparison of the text only.