Housing Provisions clause · ABCB Housing Provisions 2025
10.2.20 Baths and spas
Part 10.2 Wet area waterproofing
Baths and spas, except freestanding baths and spas, must—
have an upturn lip; and
be recessed into the wall (see Figure 10.2.20); and
have the water resistant substrate materials of the wall pass down inside the upturn lip (see Figure 10.2.20).
Figure 10.2.20 Typical bath junctions
Figure Notes
Rebating of timber and steel framed walls must be in accordance with AS 1684 or NASH Standard Part 2 as appropriate.
Where rebating of masonry walls is required, it must be accommodated for in the design in accordance with AS 3700.
For diagram (c), where a waterstop cannot be provided, a Type 1 or Type 2 junction can be used with AS 3740.
Same wording in ABCB Housing Provisions 2022. See ABCB Housing Provisions 2022 10.2.20.