Housing Provisions clause · ABCB Housing Provisions 2025
10.2.31 Door jambs on tiled floors
Part 10.2 Wet area waterproofing
Where the bottom of a door jamb does not finish above the floor tiling, the portion of the door frame below the floor tiling must be waterproofed to provide a continuous seal between the perimeter flashing and the waterstop.
Same wording in ABCB Housing Provisions 2022. See ABCB Housing Provisions 2022 10.2.31.