Housing Provisions clause · ABCB Housing Provisions 2022

10.2.31 Door jambs on tiled floors

Part 10.2 Wet area waterproofing

Open 10.2.31 on NCC Online ↗

Where the bottom of a door jamb does not finish above the floor tiling, the portion of the door frame below the floor tiling must be waterproofed to provide a continuous seal between the perimeter flashing and the waterstop.

Same wording in ABCB Housing Provisions 2025. See ABCB Housing Provisions 2025 10.2.31.

Defined terms used