Table · ABCB Housing Provisions 2025

Table 10.8.1 Vapour permeance requirements

Part 10.8 Condensation management

Open Table 10.8.1 on NCC Online ↗
Climate zoneWall constructionVapour permeance (µg/N.s)
1No cavity≥ 0.0022 to < 1.1403
Drained and ventilated cavity≥ 0 to < 1.1403
3No cavity≥ 0.1429
Drained and ventilated cavity≥ 0.0022
4, 5No cavity≥ 1.1403
Drained and ventilated cavity≥ 0.1429
6, 7, 8No cavityX
Drained and ventilated cavity≥ 1.1403

Table Notes

X = A cavity must be provided in climate zones 6, 7 and 8.

Table for 10.8.1 External wall construction

New in NCC 2025. No Table 10.8.1 in ABCB Housing Provisions 2022; it may have moved or been renumbered.

Defined terms used