Table · ABCB Housing Provisions 2025

Table 3.2.1 Un-retained embankment slope ratios

Part 3.2 Earthworks

Open Table 3.2.1 on NCC Online ↗
Soil class (see 4.2.2 for material description)Site cut (excavation) (maximum embankment slope ratio, angle of site cut H:L Note 1)Compacted fill (maximum embankment slope ratio, angle of batter H:L Note 1)
Stable rock (Class A)8:12:3
Sand (Class A)1:21:2
Firm clay (Class M-E)1:11:2
Soft clay (Class M-E)2:3Not suitable

Table Notes

See Figures 3.2.1a and 3.2.1b for some examples of un-retained embankment slopes.

Retaining walls must be installed in accordance with H1D3(2) where—

the embankment slope is steeper than described in this Table; or

the soil type is not described in this Table.

Table for 3.2.1 Un-retained bulk earthworks – site cut and fill

Changed since NCC 2022 (minor wording). See ABCB Housing Provisions 2022 Table 3.2.1, or show what changed.

Soil class (see 4.2.2 for material description) | Site cut … H:L Note 1) Stable rock (Class A) | 8:1 | 3:3 2:3 Sand (Class A) | 1:2 | 1:2 Firm clay (Class … or the soil type is not described in this Table.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Clauses referred to

Defined terms used